CONTRACT DESIGN FOR REGULATION A. Estache World Bank Institute

CONTRACT DESIGN FOR REGULATION A. Estache World Bank Institute. Major issues in Contract Design. Overall design of incentives to all parties involved Specific structure of the contractual arrangement Conditions for evaluation Financing and risk allocation Social objectives.

ania
Download Presentation

CONTRACT DESIGN FOR REGULATION A. Estache World Bank Institute

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CONTRACT DESIGN FOR REGULATIONA. EstacheWorld Bank Institute

  2. Major issues in Contract Design • Overall design of incentives to all parties involved • Specific structure of the contractual arrangement • Conditions for evaluation • Financing and risk allocation • Social objectives

  3. Issues in structuring contracts: A Checklist • Asset Valuation • Package size • Duration of concession • Tariff conditions • Termination conditions • Performance assurance • Quality Control • Investment plans • Social and other service obligations • Check for the internal consisteny of requirements

  4. Assessing Assets • what is the minimum price? • how did you get there? • did you check for changes in demand? • use the underlying financial model to make sure that all the requirements built in the contract are internally consistent

  5. Determinants of package size • Economies of scale or scope • Ability to “unbundle” • vertical (functional) • horizontal (spatial) • Effects on degree of competition

  6. Determinants of contract duration • Competitive advantage of frequent retendering • Versatility of assets (technological changes) • Practicability of asset buy-back or pass-on • Impact on willingness to compete • Impact on asset maintenance

  7. Termination conditions • Automatic renewal? • Negotiated roll-over? • Asset/New investment buy-back by government? • Asset/New Investment transfer to new concessionaire?

  8. Issues in tariff control • price cap vs. rate of return? • price discrimination allowed? • Degree of external competition • Social and distributional objectives • Impact on commercial efficiency

  9. Performance assurance • Contractual specification? • Requirement for monitoring? • information annex (see P. Burns’ presentation) • Payment incentives?

  10. Investment plans • Investment requirements in concession contracts • Need for monitoring • Need for flexibility since demand is often uncertain

  11. Quality requirements • Technical vs. service quality • Independent quality control • Age specification in contracts • Too much vs. too little quality? • Who pays for quality? • Are penalties for violation built in?

  12. Conditions for Evaluation • Consortia limitations • Pre-qualification requirements • Bidding processes • Award criteria

  13. The role of consortia in contract design • Infrastructure concessions • increased funding base • broader interest in system design • longer term commitment • Associations in service franchises • changes competitive scope • discipline in larger packets larger package increased competition

  14. Prequalification to reduce customer risk • Construction risk • technical experience check, construction bond • Operations risk • key staff listing, evidence of insurability, investor equity requirement • Financial risk • financial balances, institutional support • Legal risk • guarantee of compliance with conditions

  15. Award criteria • Minimum duration? • Lowest user tariff? • Best financial deal for government? • flows vs stock payments • revenue vs subsidies • Highest level or earliest investment? • Highest number of retained employees? • Multicriterion ranking? • Best solution to particular problem?

  16. Example Bidding in Argentina (1) • Rail freight: 2 envelopes and decision based on points scored • (1)technical & finacnial qualification.; • (2) weighted selection criteria (staff recruited, experisnce, plans, fees to gvt,...) • Urban passenger rail: 3 envelopes; award based on highest fee to gvt or lowest subsidy • (1) technical • (2) plan • (3) financial

  17. Example Bidding in Argentina (2) • Ports: 2 envelopes and winner is highest fee paid to gvt but one forms can’t win more than one terminal • (1) technical and plan • (2) minimum fee guaranteed to gvt • Toll Roads: 4 envelopes: winner is lowest toll; if = : lottery • (1) prequal on financial staus • (2) technical + payment of $25,000 • (3) contract proposed and financial guarantee • (4) specific toll offer

  18. Inclusion of risk mitigation aspects • commercial, exchange, policy risk • Guarantees • Exclusivity • Speed of process

  19. Examples of Social Issues to be addressed by Contract Design • Social services (more below) • Social tariffs • Safety • Environment

  20. Reconciling Social Concerns and PrivatizationA case study of the transport sector • The Context: Social Role of Transport Policy • in Argentina, % of poor among train riders is around 25% • in Manila, public transport takes 14% of the poor income vs. 7% of the non-poor • walking 10km to work common in rural areas • so issue is to provide affordable transport to places of employment/education • The main tools: inclusion of Service Obligations in contract in a financially consistent manner

  21. What Are Service Obligations? • generic definition: Obligations of an operator to offer either a full range or a specific package of services • of good quality (when is it too much or too little) • to all users (Universal Service Obligations) • at affordable rates (What is affordable?) • precise definition is needed but it will vary across countries, sectors and situation • railways: obligation of continuity, regularity, capacity, targeted discounts, affordability • water: much stronger

  22. Checking for Affordability • Assess the burden of a particular service on the budget of specific consumer groups • Determine whether that burden is deemed consistent with social concerns of the government • Check whether the acceptable price is consistent with the other requirements imposed on the private provider (implementation speed, financing requirements, service quality....)

  23. Funding the needs of the poor • First measure and minimize costs • cost models (US telecoms) • create your own benchmarks (UK, Uruguay and Brazil in water, New Zeland and Australia in most sectors) • link costs to benefits and decide if it is worth it • if it is worth it: decide on pricing rules vs explicit subsidies

  24. Affordability and Pricing • tariffs design (2 parts, discrimination) • access surcharges on operators • other surcharges on operators to finance investment funds (telecoms)

  25. Affordability and Subsidies • targeted subsidies...but only if can target well (e.g. specific routes) and requires a good tax system • income supplements • ...better than payments in kind when possible • subsidies on journey-to-work tickets thru employers • ...but misses the informal sector • cross-subsidies within clearly delineated service areas • built in in access pricing pricing rules in the regulatory framework to recover costs

  26. Some subsidy schemes .…Don’t work • Subsidizing the operator blindly • money does not go to better service (less invest. or quality) • control of public fare levels: • kills profitability and hence service • benefit the non-poor • ...unless clear rules for subsidies matching revenue loss • control of public fare discrimination • poor get less service (airline,...) • poor pay for rich