IPA 2008 – support to environment Brussels, 28th November PEIP Regional Meeting. Joanna Fiedler European Commission DG Environment. Component I Component II Component III Component IV Component V. Transition Assistance and Institution Building Cross-border Co-operation
E N D
IPA 2008 – support to environmentBrussels, 28th NovemberPEIP Regional Meeting Joanna Fiedler European Commission DG Environment
Component I Component II Component III Component IV Component V Transition Assistance and Institution Building Cross-border Co-operation Regional development Human resources development Rural development Structure of IPA Component III, IV, V for Candidate countries
Component I Institution building and transition assistance • National programmes (environmental projects) • Regional and horizontal programmes (multi-beneficiary programmes) environmental projects • Status in November – approved by IPA Committee awaiting Commission decision!!! • Presenting an overview of main environmental projects in IPA Component I – details in the Commission Decisions – DG ELARG web site.
IPA 2008 ~ 60 mln for env (Comp I national) CARDS ISPA PHARE IPA 2007 ~63 mln for env (Comp I national) IPA 2009
NATIONAL PROGRAMMESAlbania • Consolidation of the Environmental Monitoring system in Albania (2.0 mln Euro) • Improvement of environmental data quality through expansion and consolidation of a sustainable, integrated and effective environmental monitoring system capable of using the environmental norms and directives of EU as a general reference framework
Bosnia and Herzegovina Strengthening of Bosnia and Herzegovina Environmental Institutions, preparation for pre-accession funds and support to environmental infrastructure development (4 mln Euro) • Component 1 – capacity building on project preparation • Component 2 – support to needed investments project (project preparation actions)
Croatia • Enforcement of the new Environmental Protection Act harmonised with EU legislation in cases of criminal offences against the environment (1.045 mln Euro) • Former Yugoslav Republic of Macedonia • Strengthening the central and local level capacities for environmental management (EUR 3.1 mn) Focus on waste management, IPPC, air quality, EIA
Montenegro • Upgrading of Environmental Infrastructure (3.5 mnl) - Construction of the Niksic wastewater treatment plant to standards that meet EU Directives. - Supervision of the procurement and construction activities. - Training of operational and maintenance staff. Tariffs will be increased, taking account of affordability, to meet operating and maintenance costs. Support for Environmental Management (1 mln euro) - EPA development, polluter register, awareness raising
Serbia • Hazardous waste management (1.5 mnl euro) • Municipal Infrastructure support programme (45 mnl euro) (project preparation and implementation) • Assistance in Implementing of Chemical Management System (1.5 mln) • Environmental Protection at Thermal Power Plants (11 mln euro)
Kosovo under UNSC 1244/99 • Improving Environment (18 mln Euro) Drinking water supply is improved in Mitrovica and Pristina regions and remaining dumpsites are to be closed.
Turkey • The REACH Chemicals Project (2.25 mln Euro) • Improving Emissions Control (1.9 mln Euro) • to transpose and implement National Emission Ceilings Directive (2001/81/EC) in Turkey. • Integrated Pollution Prevention and Control (2.3) • reform of the administrative, legal and technical structures to implement integrated environmental permitting systems/procedures for IPPC installations in Turkey • Mining Waste Management (4 mnl Euro)
IPA 2008 Regional Programme • Sava River Basin Management Plan (1.3 mln) Improve integrated water management of the Save river basin. • Sava River basin Analysis report • Save river basin management plan • Identification of investment projects (to implement the river basin management plan) • Meetings and workshops • Stakeholders dialogue • Guidelines to establish water pricing policies (WFD)
IPA 2008 Regional Programme • DABLAS Support and Secretariat Services (0.5 mln) (PHARE 2006 and IPA 2007) • Facilitate the approximation to the EU acwuis in the field of water • Project pipeline updated • Secretariat meetings • Training, guidelines, • Projects identification, guidelines on preparation
Joanna Fiedler Desk Officer Relations with IFIs Serbia and Syria Turkey investments Coordinator of ISPA/PHARE/CARDS/ IPA Unit for Enlargement and Neighbouring Countries European Commission – DG Environment Email: joanna.fiedler@ec.europa.eu Tel: 0032-2-2990310