Carrier Pre-Select Meeting BT Systems Interface Roadmap. Graham Crane 18 th September 2007. Cautionary Statement BT's 21st Century Network is still in the process of development and the subject of consultation. The information in this presentation may be subject to change'. Contents/Agenda.
E N D
Carrier Pre-Select MeetingBT Systems Interface Roadmap Graham Crane 18th September 2007
Cautionary Statement BT's 21st Century Network is still in the process of development and the subject of consultation. The information in this presentation may be subject to change'
Contents/Agenda • 21CN Systems Architecture • Roadmap & Example Interface • Detailed documents / Further Information
Key: Firm Plans Concept Figure 1: Roadmap Outline – Driving Change Programme BT Wholesale Openreach 2006/07 2007/08 2008/09 2009/10 2010/11 Undertakings/EOI Physical Separation of BT Systems 21C CE (Customer Experience) 21CN Remake Our Portfolio Gateway Impacts BT Wholesale: North Side Migration Apr 07 Onwards wBC Apr 08 Other products tba Openreach: EMP 200 June 06 WLR3 Dec 06 ISDN 2 Sept 07 ONES Sept 07 ISDN 30 Dec 07 VLA Q3/4 08 Other products tba Strategic Gateways Built 21CN Product Migration1 Current Gateway Closures2 Note 1: This migration follows undertaking/EOI ones Note 2: Not yet planned and will be subject to industry negotiation
Customer Services Example of new Systems Interfaces – based on Wholesale Broadband Connect (WBC) CP Systems XML BTWholesale Portal B2B Gateway Service Availability Raise/modify/cease Order Diagnostics Raise Fault CRM (OneSiebel)
Strategic Changes – WBC ExampleOur vision and how it will impact CPs More interactive B2B interface – no longer need to poll for responses, responses to pushed back by BTW Improving Scalability and Resiliency of the B2B Gateway – deploying a B2B gateway with greater scalability and resilience Greater consistency of interfaces – Provision and fault B2B interfaces currently use different technology. Provision interface to use same technology as current Fault interface for WBC Consistent experience across BT Products – similar B2B interface as is used for Openreach products SMPF/MPF Updating your interface with us - to use more up to date technology – e.g. using later versions of Siebel, browser-based client -no client deployment needed. Consistent across UK Industry – Aligned with Consult21 & NICC B2B
Customer systems interface (B2B) roadmap document • Roadmap Structure: • Introduction • Roadmap Outline – 1-5 years • Collaboration Platform / B2B Target Architecture • Dialogue Services • Governance • EoI/Undertakings & 21CN inter-working & dates • Requirements, Issues & Next Steps • Pathfinder & 21CN Migration • Further information • Annexes • Planned changes & consultations • Pathfinder Interface Impacts - Product by Product • 21CN Products • Interface by Interface plans
Roadmap – More Detail • Annex 1: Outline Roadmap • Undertakings Separation • 21C Customer Experience • 21C Products • Pathfinder If required Open roadmap & go through Annexes 1 & 2 See Roadmap on Consult21 Systems & Process WG pages for more detail Please Note: The roadmap is a summary of current known plans and a guideat the time of publication. Formal notifications of change will come out through the normal product channels or via the Consult21/21CN migration plan consultations as appropriate;
Links to Detailed information • BTW Gateways • BT Wholesale B2B Gateway • BT Wholesale B2B Gateway News • BT Wholesale Gateway Migration • Eco Broadband • Eco Order • Eco Repair • See also NICC B2B Forum - Published Documents • Openreach Gateways Including EMP • Openreach • Wholesale Line Rental 2 (WLR2) • LL Product & LLU Technical • Other Openreach Products • See also NICC B2B Forum - Published Documents Source: NICC B2B @ http://193.113.58.84/twiki/bin/view/Work/FurtherInformation
Further Information Consult21 Systems & Processes working group @ http://www.btwholesale.com/consult21 Consultations, issues, requirements to date Systems Interface Roadmap Document NICC B2B @ http://niccb2b.org.uk/ Work plan & progress Standards & ways of working established to date Next steps – T2R, L2C, etc Useful Links Email: graham.crane@bt.com