1 / 9

Preparation of D2.2b “ Pre-final Framework Implementation”

Preparation of D2.2b “ Pre-final Framework Implementation”. BME Consortium Meeting, Reggio Emilia Oct. 2 2 , 2009. Schedule. D2.2a First Framework Implementation M18 Initial set of tools D2.2b Pre-final Framework Implementation M24 Almost complete set of tools

annick
Download Presentation

Preparation of D2.2b “ Pre-final Framework Implementation”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Preparation of D2.2b “Pre-final Framework Implementation” BME Consortium Meeting, Reggio Emilia Oct. 22, 2009

  2. Schedule • D2.2a First Framework Implementation • M18 • Initial set of tools • D2.2b Pre-final Framework Implementation • M24 • Almost complete set of tools • Implementation of tools can be initial • D2.2c Updated Framework Implementation • M36 • Final set of tools containing improvements based on feedback

  3. Annex I – Description of Work D2.2b extends and slightly modifies the content of D2.2a where needed „As update of D2.2a, this deliverable contains the detailed description of the implemented model transformations, the usage of the integrated tool-chain and the configuration (tailoring) capabilities, and all relevant transformation or integration means needed by the other WPs.” • New extension to D2.2a • Lot of partners involved • We have integrated tool-chains and those can be executed

  4. Content • We have two frameworks • Generic Tool Integration Framework • Supports integration of tools in general • Test generation processes are „installations” in it • MOGENTES Test Generation Framework • Supports generation of tests in general • Demonstrators are installations of it

  5. Structure of D2.2b • General Tool Integration Framework (update) • description of components, installation, user guide (BME) • MOGENTES Test Generation Framework (update) • generic + demonstrator installations • update to short descriptions of all components (all partners) • serve as a summary of the results in MOGENTES? • description of abstract test cases – here? (TUG, ETH, AIT, BME) • description of parameterization of UML models (AIT, BME + industrial partners) • Transformation descriptions (new)

  6. Structure of D2.2b (cont.) • Transformation descriptions (new) • implementation of parameterization (AIT, BME) • UML2OOAS (AIT) • UML2UPPAAL (BME) • OOAS2AS (TUG) • Simulink2AS (ETH) • ? (SP) • Abstract TC to executable TC (industrial partners, AIT)

  7. General Tool Integration Framework Extended jPDL + JBOSS Graphical Process Designer New component • Interface to jBPM engine and Artefact Manager • Based on Process Model • Apache Jackrabbit based implementation Support for • managing traceability information • distributed storage Sensoria Development Environment (SDE) JBOSS jBPM workflow engine

  8. MOGENTES Test Generation Framework

  9. ETH version Would be nice to harmonize with previous figure

More Related