160 likes | 357 Views
GridKa Cloud T1/T2 at Forschungszentrum Karlsruhe (FZK). 31.10.2007. Content. Prodsys Site Reports HEPHY-UIBK. 31.10.2007. Prodsys. 31.10.2007. Prodsys. Central Database: Tasks – Groups of jobs Jobs – job definitions Attempts – attempt info for jobs
E N D
GridKa Cloud T1/T2at Forschungszentrum Karlsruhe (FZK) 31.10.2007
Content • Prodsys • Site Reports • HEPHY-UIBK 31.10.2007
Prodsys 31.10.2007
Prodsys Central Database: Tasks – Groups of jobs Jobs – job definitions Attempts – attempt info for jobs Supervisor(Eowyn): Retrieves jobs from DB Passes to GRID through Executor Manages job attempt info Executor(per grid flavour): Create wrappers etc for submission Submit job Manage Job + interpret output (failure reasons etc) 31.10.2007
Content • Prodsys • Site Reports • HEPHY-UIBK 31.10.2007
Site Report Munich LRZ WN: 37 Sun X2200 (148 cores) 2.6 GHz 2 GB RAM per core SE: dCache (10 Pool Nodes) 38 TB Planned Expansion: Storage 150 TB 60 WN‘s (240 cores– Xeon X3230) , 2.66 GHz, 2GB/core Testbed SE/CE 31.10.2007
Site Report Prague WN: >300 cores 2.6 GHz 2 GB RAM per core SE: DPM 25 TB Planned Expansion: 6 WN‘s (24 cores) 31.10.2007
Site Report Polish-Sites WN: ares.cyf-kr.edu.pl: 44 Itanium , 2.8 GHz 2 GB/core zeus02.cyf-kr.edu.pl: 133 Xeon (266 cores), 2.8 GHz, 1 GB/core ce.cyf-kr.edu.pl: 40 Xeon (320 cores), 2.33 GHz, 2 GB/core SE: DPM 30 TB 31.10.2007
Site Report Swiss 31.10.2007
Site Report Munich RZG WN: 6 IBM BC dual CPU (192 cores) 3 IBM BC dual quadcore CPUs (336 cores) 2 GB RAM per core SE: dCache 45 TB Planned Expansion: Storage ~250 TB 4 IBM BC dual quadcore CPUs 31.10.2007
Site Report Wuppertal WN: 25 Dell (100 cores) 2.6 GHz 1 GB RAM per core SE: dCache ~40 TB Planned Expansion: 4 HP storage server (216 TB) 68 HP WN‘s (544 cores) , 2.33 GHz, 2 GB/core 31.10.2007
Site Report Freiburg WN: 31x SUN X4100 (62 cores) 2.2 GHz 2 GB RAM per core SE: dCache 24 TB (Atlas: 13 TB) Planned Expansion: 5 HP storage server (180 TB) 48+ HP WN‘s (384+ cores– Xeon) , 2.66 GHz, 1 GB/core 31.10.2007
Site Report Göttingen Federated Tier2 with DESY Start of Production: beginning (spring) 2008 Hardware Plan: 3 Racks (water cooling) ~100 Blades (800 cores – Xeon) ~100 TB Storage 31.10.2007
Content • Prodsys • Site Reports • HEPHY-UIBK 31.10.2007
HEPHY-UIBK WN: 25 Xeon (68 cores) 2.4 - 3.0 GHz 1 - 1.5 GB RAM per core SE: DPM, Classic SE ~10 TB 31.10.2007