1 / 8

Brief Update on Product Developments (GRWG)

Brief Update on Product Developments (GRWG). Jo Schmetz 1 on behalf of Tim Hewison 1 and all GSICS Research Working Group EUMETSAT. GEO-LEO IR Product Status 2011-10.

anson
Download Presentation

Brief Update on Product Developments (GRWG)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Brief Update on Product Developments (GRWG) Jo Schmetz1on behalf of Tim Hewison1and all GSICS Research Working Group EUMETSAT

  2. GEO-LEO IR Product Status 2011-10 1Pre-Operational version for Meteosat-8 and -9 nearly ready in to run in Operational Suite, using IASI or AIRS, but need delta Correction AIRS->IASI

  3. LEO-LEO IR Product Status 2011-10

  4. LEO-LEO Correction for Heritage Instruments Product Status 2011-10

  5. GEO-LEO Solar Product Status 2011-10 • Strategy: Combine various invariant targets (DCCs, deserts, etc) and direct comparison of ray-matched collocated observations • PI identified for each method and tasked to: • Conduct error analysis of each method • Draft Outline ATBD for application to GEO imagers • GPRCs encouraged to implement common versions of (at least): • Rayleigh Scattering/Sun Glint – following ATBD from P. Henry - TBC • Deep Convective Cloud – following ATBD D. Doelling – delivered August 2010 • Web Meeting 2011-10-26 to review DCC ATBD • GPRCs to report results at GRWG meeting March 2012 • Aim for demonstration products in 2012

  6. GRWG Action Tracker • GRWG Actions Reviewed and Updated in GoogleDocs 2011-09-27 • Flag delayed actions: • EP06_01 • Instrument monitoring website • GRWG Chair GRWG to define what should be the key factors that need to be displayed in the GSICS Instrument Monitoring web sites. • Action has been taken up by GCC Acting Deputy Director • EP10_18 • Liaise with SCOPE-CM Pilot Projects to issue Needs Statements • EP Chair and GRWG Chair • NOAA (Mitch Goldberg) and EUMETSAT (Tim Hewison) to liaise with the SCOPE-CM Pilot Projects (1), (3) and (5) respectively, in order to better understand their needs and facilitate the finalization of the Statement of Needs. • Further inputs received at GSICS Users’ Workshop – what now? • GRWG06_33 • Validation of metadata and unit definitions to be submitted to the CF committee. • All GPRCs / GRWG Chair • "GRWG to support the validation of the metadata and unit definition before GDWG re-submit them to the CF committee. See: https://gsics.nesdis.noaa.gov/wiki/Development/StandardVariableNames“ & gsics-dev e-mail group thread • GSICS Conventions are currently being revised – so need to repeat this validation

  7. Questions to Exec Panel • None!

  8. Thank You Any Questions?

More Related