New Queensland Licensing Pathway

MAIN MENU. QUIT X. Use the menu below to jump to a particular section or use the arrow at the bottom of the screen to begin at the start. New Queensland Licensing Pathway. Introduction. SECTION 1 – Pre Operational checks. SECTION 2 – Site / Job planning. SECTION 3 – Set up crane.

Download Presentation

New Queensland Licensing Pathway

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAIN MENU QUIT X Use the menu below to jump to a particular section or use the arrow at the bottom of the screen to begin at the start. New Queensland Licensing Pathway Introduction SECTION 1 – Pre Operational checks SECTION 2 – Site / Job planning SECTION 3 – Set up crane Links have been disabled. Use your Enter button or mouse click to move to next screen. SECTION 4 – Operate crane SECTION 5 – Shut down and Dismantle SECTION 6 – Special Operations CRANE CHARTS PDF CONTACT EASY GUIDES WWW EASY GUIDES ONLINE Crane charts Hand and whistle signals Click to start

  2. An example of a Non-slewing Mobile Crane Non-slewing mobile crane (Rough terrain, hydraulic boom type)

  3. Hazard control measures When planning a crane procedure the hazards you would need to look at include: Identify/detect all site hazards. Adequate lighting for night operations. Barriers. Flashing lights. Traffic control. Warning signs. Make sure crane operator is wearing PPE. (continued next slide)

  4. PREV MAIN MENU NEXT Taking care on a suspended concrete slab Your mobile crane is set up on a ground floor suspended concrete slab. The precautions you need to look at before you do any lifting include: Structural strength of slab, taking into account the mass of the crane with the load. For example: Crane + load = 20 tonnes Propping should be as per engineer’s specifications and located in identical position to each floor and should ultimately bear on the ground. Slab strength = 25 tonnes (continued next slide)

  5. Working on soft ground To improve the load distribution under a crane when you have to work on soft ground you can use the following: For example: mats on timber pads concrete rafts steel plates