1 / 5

New Queensland Licensing Pathway

MAIN MENU. QUIT X. New Queensland Licensing Pathway. Introduction. SECTION 1 – Plan lift. SECTION 2 – Site / Job planning. Links have been disabled. Use your Enter button or mouse click to move to next screen. SECTION 3 – Set up crane. SECTION 4 – Perform lift.

vidor
Download Presentation

New Queensland Licensing Pathway

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MAIN MENU QUIT X New Queensland Licensing Pathway Introduction SECTION 1 – Plan lift SECTION 2 – Site / Job planning Links have been disabled. Use your Enter button or mouse click to move to next screen. SECTION 3 – Set up crane SECTION 4 – Perform lift SECTION 5 – Shut down and secure crane SECTION 6 – Special operations Crane charts CONTACT EASY GUIDES WWW EASY GUIDES ONLINE Hand and whistle signals Click to start

  2. The information in this show is for operating a Self-Erecting Tower Crane. A self-erecting tower crane means: a type of tower crane whose elements are not split into their component parts but are transported from one site to another in a compact folded up style. The erection and dismantling process of the crane is much faster than fixed type tower cranes. Power is supplied through a power cable connected to an external power supply. The crane is set up on integral outriggers or stabilisers with adequate packing.

  3. Job procedures before setting up When preparing an operational plan for cranes you would need to do the following: • Job requirements. (Plan the job) • Priorities. (What is most important?) • Workplace rules. (Check site rules) Protect pedestrians and traffic (continued next slide)

  4. RIGGER’SCERTIFICATE Qualification needed to set up a self-erecting tower crane To set up a self-erecting tower crane you need to have an intermediate or advancedrigger’s certificate.

  5. 12 11 1 10 2 9 3 8 4 7 5 6 Working near aircraft traffic zones If the self-erecting tower crane is located near aircraft traffic zones the following actions must be taken: A red warning light may be installed at the uppermost point of the crane. Directions from the Airport Authority may state operational hours for the crane operation. maximum jib elevations Information from the Airport Authority may state maximum jib elevations for any luffing type operations.