Southern Willamette Valley May 2009 Extended Monitoring Results

Southern Willamette Valley May 2009 Extended Monitoring Results. A long time ago … . Glen Mutti – OSU Grad Student What was needed to determine a 1.0 mg/L change in Groundwater quality . What could be done in lieu of installing another 20-30 wells?. What needed to happen.

apu
Download Presentation

Southern Willamette Valley May 2009 Extended Monitoring Results

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Southern Willamette Valley May 2009 Extended Monitoring Results

  2. A long time ago … • Glen Mutti – OSU Grad Student • What was needed to determine a 1.0 mg/L change in Groundwater quality

  3. What could be done in lieu of installing another 20-30 wells?

  4. What needed to happen • Locations to gather data were evaluated • Well logs were researched • Project summary and permission slips were mailed ~200 residents • Telephone and mail follow-up on no response • Almost 2 weeks of field work – with 3-4 samplers • Lots of discussions

  5. THE END