1 / 1

FOLLOW-ON OF A SUBSURFACE YOYO

FOLLOW-ON OF A SUBSURFACE YOYO. The YOYO-2001 project is to follow-on of a subsurface yoyo (Provost and du Chauffaut, 1996-1998) and benefits from the experience and skills gained in the course of development and testing of the latter.

aqua
Download Presentation

FOLLOW-ON OF A SUBSURFACE YOYO

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FOLLOW-ON OF A SUBSURFACE YOYO The YOYO-2001 project is to follow-on of a subsurface yoyo (Provost and du Chauffaut, 1996-1998) and benefits from the experience and skills gained in the course of development and testing of the latter. The YOYO is moved by a change of flotation due to pumping in and out hydraulic oil from an external bladder to an internal reservoir.This subsurface YOYO moves up and down along a taut cable of a subsurface mooring between a depth of 100 meters and a subsurface depth of about 50 meters. Subsurface YOYO’s q- are deployed at the equator and 20°W within the PIRATA mooring array (in the Atlantic) and at 41°S and 55°30’W within the Brazil Malvinas Confluence (South West Atlantic).

More Related