1. Essentials of Project Management A Presentation To OTCTC 3/17/06
By Dan Reke, PMP,
MSPM Orange Belt
2. Presentation Scope What is a “project”?
What does it mean to “manage” a project?
Project Management Processes/Phases
Project Managers
Skills
Organization
Training
Certification
Employment Market
3. What Is A Project? Let’s Play “Is this a Project?”
4. Cleaning My Garage Every year (almost), I:
Check the weather.
Pull everything out of my garage.
Sweep out the cobwebs.
Clean off the foundation
Sweep the floors.
Scrub the floors.
Let the floors dry.
Wash off the things that go on the shelves
Put everything back in the garage.
Is that a “project”?
Why?
5. Painting and Degreasing My Garage Two years ago, I decided that I should:
Paint the inside of my garage, and
Clean the gunk of the floor with a solvent called “Goof Off”.
I couldn’t just pull everything out, because this would take several days.
So I had to plan out several steps to:
Move things from one area of the garage to another,
Paint the walls,
Clean the floors with a solvent.
Move things to another area of the garage.
Etc.
Was that a project?
Was I managing a project?
6. Remodeling We are replacing flooring and remodeling our guest bathroom before our son’s graduation:
We did some refinancing for the funds.
We shopped (and shopped and shopped) for carpet and floor tile.
We placed an order for carpet and floor tile.
We requested a proposal/quote from a local contractor for repairing the bath/shower.
It was too expensive, so we decided to be our own general contractor.
We ordered wall tile from a store that would also install it.
We ordered faucets for the tub and shower from a home improvement center.
We contracted with a plumber to install the new valve.
We scheduled the plumber to come the day before the wall tile was installed.
We removed the old wall tile before the plumber came.
He put in the new valve.
The tile contractor tiled the wall.
I finished the faucets.
Added: Replace cabinets.
The flooring store’s subcontractors will install the tile.
Coordinated with cabinet installation.
The flooring store will install the new carpet.
We are coordinating the packing up of rooms for carpet installtion with painting.
Is that a project?
Are we project managing? Why?
7. Answer Key Cleaning the garage was not a project because we do it repeatedly – it’s not unique.
Painting and degreasing the garage could be called a project, but we didn’t management it as a project.
8. Answer Key Continued The remodeling is a project and we had to manage it as a project because:
It is expensive and we have limited resources, just like your organization.
We have a limit on time.
It involves several parties whose work had to be coordinated.
There are objectives we want to achieve – i.e. there was a scope requirement.
9. Definition of “Project” Work can either be classified as operations or projects.
Operations are ongoing and repetitive.
Projects are temporary and unique.
“…a project is a temporary endeavor undertaken to create a unique product or service. Temporary means that every project has a definite beginning and a definite end. Unique means that the product or service is different in some distinguishing way from all similar products or services.”
From the PMBOK Guide
10. What is project management? “The process of bringing a project to fruition in as effective a manner as possible.”
From “Managing Projects in Organizations” by ESI.
Project management almost always involves cross-functional teams.
11. Project Processes
12. Project Management Phases Selection [Develop new accounts payable system]
Analysis [What does the organization need the new A/P system to do for it in broad terms? - Customer Requirements Analysis]
Definition [What exactly will the A/P System do and how will it function? – GUI appearance, business rules, logical database design]
Design [How will the A/P System work in detail? – What’s behind the GUIs? Program flows, what DLL’s or executables will need to be constructed, and what will they do.]
14. Project Management Knowledge & Skills Knowledge of project life cycles
Project selection
Cost/Benefit Analysis
Discounted cash flow analysis (NPV, IRR)
Business Analysis
Strategic Alignment
Political Savvy
15. PM Skills Continued Planning
Scope Definition
Work Breakdown structure (decompose tasks)
1 "Single Family House - Architect Design (3,000 square feet with full basement)"
1.1 General Conditions
1.1.1 "Finalize plans and develop estimate with owner, architect"
1.1.2 Sign contract and notice to proceed
1.1.3 Apply for Permits
1.1.3.1 Secure foundation permit
1.1.3.2 Secure framing permit
1.1.3.3 Secure electrical permit
1.1.3.4 Secure plumbing permit
1.1.3.5 Secure HVAC permit
1.1.3.6 Secure miscellaneous permits
1.2 Site Work
1.2.1 Clear and grub lot
1.2.2 Install temporary power service
1.2.3 Install underground utilities
1.3 Foundation
1.3.1 Excavate for foundations
1.3.2 Form basement walls
1.3.3 Place concrete for foundations & basement walls
1.3.4 Cure basement walls for 7 days
1.3.5 Strip basement wall forms
1.3.6 Waterproof/insulate basement walls
1.3.7 Perform foundation inspection
1.3.8 Backfill foundation
16. Planning Continued Human resource needs
Time and cost estimating
Scheduling
Gantt Chart
PERT/CPM
17. Gantt Charts
18. Critical Path Method (CPM)
19. CPM Continued CPM diagrams are seldom used, but they are helpful for illustration and training.
CPM concepts are used constantly.
The critical path is the longest path.
It determines the length of the project.
They could be used even more
Focus attention on critical path activities.
20. Scheduling Schedules are almost always essential.
They help PMs to make sure that the required resources are available at the right time.
They help everyone focus on those tasks that can cause the entire project to run over.
They are useful in making decisions about scope or quality changes.
21. Planning Skills Continued Microsoft Project Schedule ? Plan
Communications Planning
Contingency Planning
Risk Analysis
22. PM Skills & Knowledge Cont’d Leadership/People Skills
Managing people without authority – See next
Political Skills
To get the needed resources and support.
Both are needed because the project team members seldom report directly to the Project
Ability to track details
23. PM Skills & Knowledge Cont’d Leadership/People Skills
Managing people without authority
Political Skills
To get the needed resources and support.
Both are needed because the project team members seldom report directly to the Project
Ability to track details
24. PM Skills & Knowledge Cont’d Contracting
Computing skills
Project Specialists (coordinators) vs. Project Managers
Industry or discipline knowledge
Some industries prefer to take people who know the industry an make them into PM’s.
E.g. Most construction PM’s are Civil Engineers
25. Project Management Organizations In some organizations, project managers can be found in many different departments, e.g.
IT
Product Development
Engineering
Facilities Management
In other organizations, the PMs are all grouped together in a Project Management Office (PMO)
Project Coordinators
26. Project ManagerTraining and Certification Most often come from the field in which they are working.
Engineering degree.
Construction Management.
Software Development
General education in a variety of areas:
Business
I/T
Finance
27. PM Training & Certification Cont’d Additional Training in Project Management
ESI International & George Washington University have a Master’s Certificate in Project Management
Areas of specialization
Many other organizations have similar programs.
28. PM Training & Certification Cont’d Certification by the Project Management Institute:
Project Management Professional. (PMP)
Requires passing a lengthy test and satisfying an experience requirement.
The questions are based on the PMBOK – Project Management Book of Knowledge
Heavy on phases and processes.
Continuing education and applying for renewal are needed for maintenance.
There are several PMP Examination Preparation Courses of about 20 hours/each.
29. PM Employment Market Department of Defense
Information Technology Organizations
Construction Companies
Typically hired from the ranks of civil engineers or people with muddy boots (i.e. job site experience)
Universities