An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Energiezentrale 400+ Energiezentrale 400+ Marktreife Energiezentrale ab 400 kW mit neuartiger, einfacher Verstromung für Wohnbau, gemeinnützige und gewerbliche Objekte Martin Miltner, Christian Kuttner, Ass.Prof. Michael Harasek mharasek@mail.zserv.tuwien.ac.at

  2. Energiezentrale 400+ The project • Funded by Austrian national grant („Haus der Zukunft“) • Duration: 24 months • Started in July 2010 • Partners: • WTI wärmetechnische Industrieanlagen GmbH • Federspiel Ökotechnology Consulting GmbH • Based on former research projects

  3. Energiezentrale 400+ Key facts • Development of a marketable, decentralised energy central in the range of 400kW thermal power • Capable for the combined production of electricity, heating and cooling for residential buildings, public utility and commercial objects • Capable of utilising a broad variety of renewable fuels based on regionally available biogenous residual materials • All sorts of baled biomass without pre-processing • Erecting, commissioning and operation of a 450kW combustion pilot plant in Leiben, Austria

  4. Energiezentrale 400+

  5. Energiezentrale 400+ Combustor geometry Secondary combustion zone (air staging) Primary combustion zone (drying, devolatilisation, gasification) Solid combustion zone (afterburning grate) Fuel feeding channel (biomass bales) Combustion pilot plant in Leiben, Lower Austria. 450kW thermal power

  6. Energiezentrale 400+ Detailed analysis of combustion apparatus by application of CFD (Computational Fluid Dynamics) Gas velocity plots in secondary combustion zone Primary combustion zone Detailed analysis of gas valves for combined volume flow measurement and control by means of CFD

  7. Energiezentrale 400+ Visit us: • www.thvt.at