220 likes | 366 Views
Moore’s Creek and Lodge Creek, Meadow Creek and Schenks Branch ----------------------------------------------- Draft Sediment TMDL Report. Gene Yagow Virginia Tech Biological Systems Engineering Dept. Second Public Meeting August 18, 2011 Charlottesville, VA.
E N D
Moore’s Creek and Lodge Creek, Meadow Creek and Schenks Branch -----------------------------------------------Draft Sediment TMDL Report Gene Yagow Virginia Tech Biological Systems Engineering Dept. Second Public Meeting August 18, 2011 Charlottesville, VA
Basis for Impairment Moore’s Creek (MSC) Lodge Creek (XRC) Meadow Creek (MWC) Schenks Branch (SNK) Unnamed Trib (XSN) Biological Metrics Abundance Diversity Pollution tolerance SCI = Stream Condition Index
TMDL Components TMDL = ƩWLA + ƩLA + MOS + FG where TMDL = total maximum daily load; WLA = wasteload (permitted) allocations; LA = load (nonpoint) allocations; MOS = margin of safety; and FG = future growth allocation.
Future Growth (FG) • Assumed % of ag and forest would decrease; % of urban would increase • Land uses that were decreased varied by what was present in the Reference (TMDL) scenario • Increases in urban were proportional to Reference scenario areas • FG = change in load between the Reference and FG scenarios
Future Growth Example (Lodge Creek) Future Growth (FG) Assumption: 20% forest to urban
Lodge Creek Sediment Loads and TMDL Existing and Reference Sediment Loads The Sediment TMDL (tons/yr) Future Growth (FG) Assumption: 20% forest to urban
Moore’s Creek* Sediment Loads and TMDL Existing and Reference Sediment Loads The Sediment TMDL (tons/yr) Future Growth (FG) Assumption: 10% hay and 0.5% forest to urban * Excludes Lodge Creek
Schenks Branch Sediment Loads and TMDL Existing and Reference Sediment Loads The Sediment TMDL (tons/yr) Future Growth (FG) Assumption: 10% forest to urban
Meadow Creek* Sediment Loads and TMDL Existing and Reference Sediment Loads The Sediment TMDL (tons/yr) Future Growth (FG) Assumption: 100% pasture and cropland and 10% forest to urban * Excludes Schenks Branch
Alternate Allocation Scenarios #1: Incorporates statewide BMPs used in the Virginia WIP to achieve downstream TMDLs (% reductions calculated from results) • Baseline + BMPs = Allocation • % reduction = (baseline – Allocation)/baseline #2: Trial-and-error (% reductions changed first) • Baseline * % reduction = Allocation
Moore’s Creek* Sediment Load Allocation * Excludes Lodge Creek
Meadow Creek* Sediment Load Allocation * Excludes Schenks Branch
Next Steps • Receive comments on Draft TMDL Report and update for submission to EPA • Setup work groups to transition to Implementation Planning
Questions? • For more information, contact Gene Yagow 540-231-2538 eyagow@vt.edu