BI Outlook for 2013-15BI Day 2012 Based on latest (last Monday) feedback from EN/EL As foreseen originally Partially ‘As foreseen originally‘ Postponed XXX XXX XXX
LINAC4: Wewillinstall and commission L4 beam instrumentation (BPM, BLM, BCT, Grids, scanners…) during LS1 followingprojectprogress L4 Beam Instrumentation
LEIR [Consolidation]: LEIR ECoolcollector exchange + replacement of the cathod. L4 Beam Instrumentation ECool
L2/3/PSB/PS [Renov]: SEM electronicswillberenovated all over CPS complex. SEM L4 Beam Instrumentation IPM
L2/4 [LINAC4]: New PUs for LT, LTB and BI lines to PSB, including new electronics and SW. SEM BPM L4 Beam Instrumentation IPM
L2/4 [Consolidation]: New cables for BCT around inflector zone will be installed (the BCT on L4 side of the wall will not be cabled during LS1.).PSB [LIU]: New cable for PSB slow BCT for injection watchdog will not be pulled during LS1. SEM BPM BCT L4 Beam Instrumentation IPM
PSB Inj [LIU]: The cables for the observation monitor on H0/H- injection foil will not bepulledduring LS1. SEM BPM BCT L4 Beam Instrumentation BTV IPM
PSB [LIU]: New cables for the new PSB orbit and trajectory system will not be pulled BUT this system will be installed and commissioned via existing OASIS channels with slightly reduced performance (S/N). Old system remains as is. BPM SEM BPM BCT L4 Beam Instrumentation BTV IPM
PSB [LIU]: New cables for the new PSB BLM system will be pulled in // to the old ones for the existing monitors in the ring only NOT for the extra 32 ring BLMs, NOT for the existing monitors in the transfer line, NOT for the new fast BLM requested. Old system will remain as is. New system will be commissioned in parallel in the ring BPM BLM SEM BPM BCT L4 Beam Instrumentation BTV IPM
PSB : General maintenance on BWS. We hope to be able reach 20 m/s in the PSB with present set-up. We also plan to improve our PM dynamic range during LS1 BPM BLM SEM BWS BPM BCT L4 Beam Instrumentation BTV IPM
PSB [Consolidation]: New cables and monitors for PSB extraction fast BCTs will be installed BPM BLM BCT SEM BPM BCT L4 Beam Instrumentation BTV IPM
HIE-ISOLDE: We will produce and deploy the new HIE ISOLDE diagboxes following project planning. Some issues remain to be tackled: i.e. Short FC limitations, manpower for the electronics development BPM BLM HIE DiagBoxes BCT SEM BPM BCT L4 Beam Instrumentation BTV IPM
PS[Conso]: * New cables and monitor for the PS ring fast BCT will be installed * 1000 turn BCT will be made operational * BUT cables for TT2 BCTs may not be pulled. A cable tray (~100 m) is missing and would have to be financed. BPM BLM HIE DiagBoxes BCT SEM BPM BCT BCT L4 Beam Instrumentation BTV IPM
PS[LIU]: New cables for the PS BLM renovation (ring, TL and fast) will not be pulled during LS1. BPM BLM HIE DiagBoxes BCT SEM BPM BCT BCT BLM L4 Beam Instrumentation BTV IPM
PS[LIU]: New cables for the PS BWS bunch by bunch measurement tests on SD68 will be pulled. We also plan to improve our PM dynamic range during LS1 but we cannot reach 20 m/s in the PS with current PS. BPM BLM HIE DiagBoxes BCT SEM BPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
PS[LIU]: 2 new WCM monitors will be installed. BPM BLM HIE DiagBoxes BCT SEM BPM BCT BCT BLM L4 Beam Instrumentation BTV WCM BWS IPM
AD[Consol]: * AD IPM will be moved and modified (strip readers instead of camera) * BBQ system will be deployed * Ctrl SW will be upgraded (ACCOR, Men, Linux). BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
SPS[Consol]: Due to EN/EL constraints, the SPS BTV renovation will only be partial. BA1 will be done. BA2 feasibility is still under discussion. BA80 will only happen in 2015 during TCC2/TDC2 campaign. BTV BTV BTV BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
SPS[LIU]: The cables for TT10 BLM installation will not be pulled. BTV BTV BTV BLM BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
SPS[LIU]: The new orbit and trajectory system fibers and cables will be installed for Pt5, 6 and 1(+). The old system will remain operational. BA 5 will be equipped to commission the new electronics BTV BTV BTV MOPOS BLM BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
SPS[NA61]: The new DCCT for personal protection (NA61) will be installed and commissioned at start-up. BTV BTV BTV MOPOS BCT BLM BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
SPS[LIU]: A new BWS prototype will be installed, provided enough space is found on cable trays. BTV BTV BTV MOPOS BCT BWS BLM BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
SPS[LIU]: The SPS BGI will be repaired and optimized (see comment LHC BGI). BTV BTV BTV MOPOS BCT BWS BLM BGI BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
SPS[LIU]: A sync light telescope will be designed and deployed if we manage to find a place for our electronics where we can pull the necessary cables. …Under investigation… BTV BTV BTV MOPOS BCT BWS BLM BGI BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
SPS[LIU]: Matching monitor installation will be finalized (for LHC as well) BTV BTV BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
EAN: New GEMs will be deployed in the north areas GEM BTV BTV BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
EAN: New ‘Scaler’ electronics will be deployed in the north areas with sampling rate > 100MHz GEM BTV SCALER BTV BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
EAN: TBIU/ID instrumentation monitors and local cabling will be entirely renovated (same but new) TBIU/ID GEM BTV SCALER BTV BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
LHC: * The temperature controlled racks (BPM&BLM) will be installed in all surface buildings. * The collimator BPMs will be installed * Cables for BPM defined by ATLAS for their forward physics project will be installed GEM BTV SCALER BTV BPM BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
LHC: If the corresponding DIC is accepted (under discussion), diode BPM will be available around the experiments Diode BPM GEM BTV SCALER BTV BPM BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
LHC: * BLM cable upgrade campaign (NGFS18) will be done. * A prototype of cryo BLM will be integrated into a cryo magnet * Arc BLMs will be dismounted/remounted following LHC consolidation Diode BPM GEM BTV SCALER BLM BTV BPM BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
LHC: BTVSE/T/S repair of RF fingers will be done Diode BPM GEM BTV BTV SCALER BLM BTV BPM BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
LHC: 2 of our 4 Fast BCTs will be replaced by ICT monitors. dT/dt interlock will be made ready for commissioning BCT Diode BPM GEM BTV BTV SCALER BLM BTV BPM BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
LHC: Installation of PUs for gated tune measurements will be done Diode BPM GEM BBQ BTV BTV SCALER BLM BTV BPM BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
LHC: * Installation of PUs for BGI calibration * BGI monitors repair and optimization will be done BGI Diode BPM GEM BBQ BTV BTV SCALER BLM BTV BPM BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
LHC: * Full maintenance of the BWS * Installation of new bellows with extended lifetime will be done BWS BGI Diode BPM GEM BBQ BTV BTV SCALER BLM BTV BPM BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
LHC: * Redesign of the extraction mirror tanks * Installation of the optical bench shielding will be done BSRT BWS BGI Diode BPM GEM BBQ BTV BTV SCALER BLM BTV BPM BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
All: An international workshop on beam profile measurements is being organized (around March April) to review and optimized our developments on our instruments (this includes CPS and SPS monitors) BSRT BWS BGI Diode BPM GEM BBQ BTV BTV SCALER BLM BTV BPM BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM
CTF3/CLIC: * EO bunch length monitor commissioning * Additional segmented dump installation * test of Cherenkov fiber BLMs * Diffraction radiation studies… BSRT BWS BGI Diode BPM GEM BBQ BTV BTV SCALER BLM BTV BPM BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation CTF3 BTV BWS IPM
Voila! Sorry for the ones I forgot in this list. BSRT BWS BGI Diode BPM GEM BBQ BTV BTV • Just a word on 2 comments: • on how to go from specs to proof of success? • on things disappearing from the requirements • It will clearly be a busy shutdown for all of us • So let start with a well deserved drink! SCALER BLM BTV BPM BTV MOPOS BCT BWS BLM BGI Matching BSRT BPM BLM HIE DiagBoxes BCT SEM BPM IPM BCT BCT BLM L4 Beam Instrumentation BTV BWS IPM