1 / 29

Power Market, Technologies Acceptance: Status Perspectives VGB Congress Power Plants 2011 Bern, Switzerland

VGB Congress "Power Plants 2011", BERN, 22nd September 2011. Page 2. Outline. About EPPSAPolicy instruments for energy

arawn
Download Presentation

Power Market, Technologies Acceptance: Status Perspectives VGB Congress Power Plants 2011 Bern, Switzerland

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    2. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 2 Outline

    3. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 3 Outline

    4. Page 4 About EPPSA VGB Congress "Power Plants 2011", BERN, 22nd September 2011

    5. Page 5 About EPPSA VGB Congress "Power Plants 2011", BERN, 22nd September 2011

    6. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 6 Outline

    7. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 7 Policy instruments for energy & climate change

    8. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 8 Policy instruments for energy & climate change

    9. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 9 Policy instruments for energy & climate change

    10. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 10 Policy instruments for energy & climate change

    11. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 11 Policy instruments for energy & climate change

    12. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 12 Policy instruments for energy & climate change

    13. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 13 Policy instruments for energy & climate change

    14. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 14 Outline

    15. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 15 Power generation demand & Technologies

    16. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 16 Power generation demand & Technologies

    17. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 17 To... meet increasing demand replace old plants at the end of their lifetime add back-up plants to balance newly installed intermittent power (solar, wind) To... meet increasing demand replace old plants at the end of their lifetime add back-up plants to balance newly installed intermittent power (solar, wind)

    18. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 18

    19. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 19

    20. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 20 Outline

    21. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 21 Power landscape – facing new complexities

    22. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 22 Uncertainty has ruled the suppliers market since 1960s

    23. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 23

    24. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 24

    25. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 25 In Germany 17,630 MW coal-fired power stations were planned. But a capacity of more than 10,000 MW was stopped. Example: Datteln Unit 4 1050 MWel, bituminous coal fired Efficiency over 45% Designed to replace 3 old power plant blocks CO2 saving of 500 000 t/a State-of-the-art environment standards Local population demanded a halt to the Higher Administrative Court The Court blocked two partial construction permits.

    26. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 26 Outline

    27. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 27 Conclusions Electricity demand in EU27 will increase to 2030 and beyond Many new fossil fuel plants are needed by 2020 Only a continuous ordering of new plants retains suppliers know how CO2 emissions from fossil plants must be cut to meet EU targets efficiency increase is the fastest track to cut down CO2 existing and new plants need the CO2 capture Reliable and shorter permit procedures are crucial A stable legal framework requires matching implementation at national level Public acceptance of new energy infrastructure is needed “The role of public policy is to generate the enabling environment for private sector financing to leverage investments into low carbon investments that often will increase long term productivity and to create new markets”* * Brussels, 8.3.2011, SEC(2011) 288 final. IMPACT ASSESSMENT. Accompanying document to the COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EURPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS, A Roadmap for moving to a competitive low carbon economy in 2050.

    28. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 28 Conclusions