VGB Congress "Power Plants 2011", BERN, 22nd September 2011. Page 2. Outline. About EPPSAPolicy instruments for energy
E N D
2. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 2 Outline
3. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 3 Outline
4. Page 4 About EPPSA VGB Congress "Power Plants 2011", BERN, 22nd September 2011
5. Page 5 About EPPSA VGB Congress "Power Plants 2011", BERN, 22nd September 2011
6. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 6 Outline
7. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 7 Policy instruments for energy & climate change
8. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 8 Policy instruments for energy & climate change
9. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 9 Policy instruments for energy & climate change
10. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 10 Policy instruments for energy & climate change
11. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 11 Policy instruments for energy & climate change
12. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 12 Policy instruments for energy & climate change
13. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 13 Policy instruments for energy & climate change
14. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 14 Outline
15. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 15 Power generation demand & Technologies
16. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 16 Power generation demand & Technologies
17. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 17 To...
meet increasing demand
replace old plants at the end of their lifetime
add back-up plants to balance newly installed intermittent power (solar, wind)
To...
meet increasing demand
replace old plants at the end of their lifetime
add back-up plants to balance newly installed intermittent power (solar, wind)
18. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 18
19. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 19
20. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 20 Outline
21. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 21 Power landscape facing new complexities
22. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 22 Uncertainty has ruled the suppliers market since 1960s
23. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 23
24. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 24
25. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 25 In Germany 17,630 MW coal-fired power stations were planned.
But a capacity of more than 10,000 MW was stopped.
Example: Datteln Unit 4
1050 MWel, bituminous coal fired
Efficiency over 45%
Designed to replace 3 old power plant blocks
CO2 saving of 500 000 t/a
State-of-the-art environment standards
Local population demanded a halt to the Higher Administrative Court
The Court blocked two partial construction permits.
26. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 26 Outline
27. VGB Congress "Power Plants 2011", BERN, 22nd September 2011 Page 27 Conclusions
Electricity demand in EU27 will increase to 2030 and beyond
Many new fossil fuel plants are needed by 2020
Only a continuous ordering of new plants retains suppliers know how
CO2 emissions from fossil plants must be cut to meet EU targets
efficiency increase is the fastest track to cut down CO2
existing and new plants need the CO2 capture
Reliable and shorter permit procedures are crucial
A stable legal framework requires matching implementation at national level
Public acceptance of new energy infrastructure is needed
The role of public policy is to generate the enabling environment for private sector financing to leverage investments into low carbon investments that often will increase long term productivity and to create new markets*
* Brussels, 8.3.2011, SEC(2011) 288 final. IMPACT ASSESSMENT. Accompanying document to the COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EURPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS, A Roadmap for moving to a competitive low carbon economy in 2050.