1 / 7

Installation

Installation. Outline. Location for Installation Present cable plant Proposed installation Cable plant. Options for Installation. Modulteststand. ACC1. ACC4,5,6. Proposal for Installation. Operate ACC4,5,6 with ATCA system Split probes and forw./refl. Power

archer
Download Presentation

Installation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Installation

  2. Outline • Location for Installation • Present cable plant • Proposed installation • Cable plant

  3. Options for Installation Modulteststand ACC1 ACC4,5,6

  4. Proposal for Installation • Operate ACC4,5,6 with ATCA system • Split probes and forw./refl. Power • Operation transparent to user operation if loop remains open, and WGT and PZT are not operated • Similar to ACC1 in parallel to VME system • Allows for software development and does not interfere with machine operation

  5. Present cabling in injector and linac

  6. Proposed racks for installation

  7. Cabling (to an within racks)

More Related