Deepwater Development - An Industry Perspective Juju Mathew 23rd & 24th May, 2013 India Drilling & Exploration Conference (IDEC) 2013, Mumbai, India
Agenda Context Setting Building Blocks • System Integration • Where do we stand
Context Setting Key Features of Subsea Development • Technology Centric. • Long Gestation period • Reliability / Availability • Robustness in Design • Operability • Host Facility
Context Setting (Contd…) Technology Centric • Specialist Vendors / Manufacturers • Large investments in R&D / Product Development. • Narrow / Limited portfolio spread • Changing Standards Gestation Periods • Product Development • Rigorous Testing Process • Compatibility • Reliability / Provenness.
Context Setting (Contd…) Lessons Learnt……. “Good judgment comes from experience, and a lot of that comes from bad judgment.” Will Rogers BP Macondo Well, 20 April 2010, 11 dead Piper Alpha accident, 06 July 1988, 167 dead Usumacinta jack-up fire, 23 October 2007, 21 dead
Context Setting (Contd…) Reliability / Availability • Proven Application • Maintenance free • Compatibility • Design Life Robustness in Design • Reservoir Characteristics • Flexibility / Future Technology Adaptation • Safety Features – Fail Safe • The Unknown
Context Setting (Contd…) Operability • Remote operation • Response time • Tooling • Subsea Intervention Host Facility • Offshore – FPSO / TLP / SPAR • Onshore Terminal • Long Step out • Subsea System Requirements
Agenda Context Setting Building Blocks • System Integration • Where do we stand
Building Blocks SURF • Installation centric • Umbilical • Riser • Flowlines – Rigid / Flexible • Jumpers – Rigid / Flexible • PLET SPS • Subsea X’mas Tree • Subsea Control Modules • HIPPS • Hardware – TUTU/UTA/DCS • Umbilical / EFL / HFL • Topside Controls • Manifolds / PLEM • Riser Bases • Tie-in Tooling • Protection Structures
Agenda Context Setting Building Blocks • System Integration • Where do we stand
System Integration Factors • Who will perform • Contracting Methodology • Cross Liabilities & Limitations • Interface Management • Indigenization • Local Infrastructure • Response System
Agenda Context Setting Building Blocks • System Integration • Where do we stand
Where Do We Stand Onland 1.39 M.Sq.Km Deepwater 1.35 M.Sq.Km Shallow Offshore 0.40 M.Sq.Km Total sedimentary Area 3,140,000 sq km
Where Do We Stand (Contd…) • Brazil
Where Do We Stand (Contd…) Norway • The government worked deliberately to Norwegianize the oil sector • US and French domination in the first decade • Labour relations were built on strong trade union influence • Worked in favour of domestic firms relative to foreign firms • But did not jeopardize economic efficiency • Ownership no issue • Environmental friendly – take care of the resources • The Ministry monitored the tendering process and bid evaluations • Norwegian based firm got early access to all tendering information Source : INTSOK Report 2011
Where Do We Stand (Contd…) What Needs to be Done • Formal policy, backed by Govt., with realistic targets & schedule • Regulatory body like OSO/OSS/ANP for monitoring & compliance • Competent & qualified local vendors to facilitate JV’s /cooperation • Plan to educate & train personnel, support business development • Promotion of technology development of local industry • Strategy to identify the most likely areas for domestic capability • Adopt structured systems for Quality and Safety Source : Goldwyn International Strategies, Columbia University