An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plan on Run #1526, 27, 28 February Shinji Machida ASTeC/STFC/RAL 23 February 2011

  2. Aims • Restore the previous beam. • Rf commissioning: tuning of individual cavity phase. • Measure 1) time of flight, 2) tune, 3) COD at several (equivalent) momenta between 12.5 and 18.5 MeV/c. • Deceleration/acceleration.

  3. Beam requirement • ALICE 12.5 MeV/c beam. • 1 bunch, 3 Hz • 40 pC • Small momentum spread

  4. Run #15Saturday 26 February, shift 2 • Master timing has been changed. 20 ms delay is introduced. • Connect Ch2-septum, Ch1-kicker1, Ch4-kicker2, Ch3-BPM-E23 and AUX-BPM-EMI to adjust timing with Lecroy scope. • Make sure which cable (length) is used for these signals. • Swap septum cable with ALICE-RF after adjusting timing.

  5. Run #15Saturday 26 February, shift 2 (continued.) • Establish 18.5 MeV/c equivalent beam for many turns for the first step. • Establish 16.5 MeV/c equivalent beam for many turns if there is enough (2~3 hours) time before 16:00. • Measure COD of 16.5 MeV/c. • Keep the same QD/QF ratio. • Peter Williams, Ian Kirkman and who else?

  6. Run #15Saturday 26 February, shift 3 • Swap ALICE-RF to EMMA-RF in Ch2 of Lecroy scope. • Back to 18.2 (18.5) MeV/c equivalent momentum. • Measurement of beam loading from splitter signal. • Phase tuning of individual cavity by beam loading signal. • (Stephen), Bruno, Alan and who else?

  7. Run #15Sunday 27 February, shift 2 • Measure COD of 16.5 MeV/c if it was not done on the previous day. • With different QD/QF ratio, measure 1) time of flight, 2) tune, 3) COD at several (equivalent) momenta between 12.5 and 18.5 MeV/c. • Ben, Bruno, Shinji (from 13:00) and who else?

  8. Run #15Sunday 27 February, shift 3 • Back to 18.2 (18.5) MeV/c equivalent momentum. • Measurement of beam loading from splitter signal. • Phase tuning of individual cavity by beam loading signal. • Yuri, David, Alan, Shinji and who else?

  9. Run #15Monday 28 February, shift 2 • Back to 18.2 (18.5) MeV/c equivalent momentum. • Global phase scan. • Capture a beam in an rf bucket. • Estimate net rf voltage. • Frank Jackson, Philippe Goudket, David, Shinji and who else? • Switch off ALICE/EMMA around 13:00 for visitors.

  10. Run #15Monday 28 February, shift 3 • Back to 18.2 (18.5) MeV/c equivalent momentum. • Phase tuning of individual cavity by beam loading signal if necessary. • Global phase scan. • Capture a beam in an rf bucket. • Deceleration from 18.5 MeV/c or acceleration from 12.5 MeV/c. • James, David, Alan, Shinji and who else?

  11. Run #167, 8, 9 10 March • Test of extraction system. • Tuning of diagnostics line. • Bruno, James and who else?