1 / 8

LPC “Run Plan ”

LPC “Run Plan ”. The LPC has 2 main efforts Training , workshops, support, mentoring … A center of excellence for CMS physics – fast and accurate We need to be sure to cover both aspects well – especially the latter. Suggest a new meeting – the “US CMS Daily Run Meeting”

bedros
Download Presentation

LPC “Run Plan ”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LPC “Run Plan” • The LPC has 2 main efforts • Training, workshops, support, mentoring … • A center of excellence for CMS physics – fast and accurate • We need to be sure to cover both aspects well – especially the latter. • Suggest a new meeting – the “US CMS Daily Run Meeting” • Showcase US efforts – LPC, ROC, Data Ops • Handoff from CERN/DESY – later handoff to India/China • Communicate the excitement of LHC data – team building, nucleation – in the US and specifically at the LPC (critical mass teams)

  2. MBNov09 tsv Central Meetings: Weekly Timetable 23:00 – (4 pm) , M-F US CMS Daily Run Meeting

  3. Nov-Dec Run Plan • 0.9 and 2.2 TeV at low luminosity • 10 million events in 1 day at 100 Hz with minbias? • Examples of physics topics • Tracking and alignment • CSC alignment with halo events • UE and minbias – measurements and Pythia tuning • Azimuthal balance of events/jets • L1 jet trigger turn on • Neutral pion reconstruction • Focus EJTerm exercises on CRAFT and early data issues?

  4. MBNov09 tsv From Massimiliano Ferro-Luzzi

  5. 2008, Low Energy Tune Up a 1 day run

  6. January + Run Plan • Sort in order of cross section – time ordered • B tag – soft muons • Photon + J compton – Pt balance • Psu in muons and electrons • W, upsilon • Z • Top pairs • Diphotons • Z -> tau decays

  7. MBNov09 tsv At 10^32 with 10 hr/day it takes ~ 30 days to get to 100 /pb.

  8. LHC – 2010 Run, Rediscover the SM, 10-100 pb-1

More Related