200 likes | 237 Views
TOPMODEL. Venkatesh Merwade. Overview. Little Background Some changes previous plans Data Methodology Results Conclusions. Background. Development Physically Based Model Important Components Soil Water Balance Topographic Index. Change in Plan. Size of the catchment
E N D
TOPMODEL Venkatesh Merwade
Overview • Little Background • Some changes previous plans • Data • Methodology • Results • Conclusions
Background • Development • Physically Based Model • Important Components • Soil Water Balance • Topographic Index
Change in Plan • Size of the catchment • 325 miles2 to 3 Km2 !! • DTM Analysis • Objective • Calibration • Effect of Grid Size • Change in Slope
Data • Discharge (on the web) • Rainfall (on the web) • DEM (Victoria Samuels) • Potential Evapotranspiration (?) • Temperature (max,min,average) • Penman Monteith (??) • Empirical (Hargreaves, 4.2.44 & 4.4.4)
Methodology • Run DTM and TOPMODEL and get myself familiar. • Errors • Calibration with original data. • Have fun with different grid size. • Have fun with different slopes. one, two, three.
Calibration Results Not very good Also not too bad!
Topographic Index Fun (TIF) O 5 10 50 20
Conclusions • Easy to calibrate (need to be careful with the text files). • Insensitive to two parameters (SRint and Chvel). • Grid size has some effect but not very significant. • Slope has very little effect on the overall performance of the model. • The show will continue……….