The Atlanta Day Shelter for Women and Children Technical Infrastructure Improvement Strategy Sarah El-Helw Josh Guy Kamau Nickerson Lucian Voicu April 23, 2008 – Final Presentation. Agenda. Overview Room by Room Results Original Goals Recommendations Timeline / Costs
E N D
The Atlanta Day Shelter for Women and Children Technical Infrastructure Improvement Strategy Sarah El-HelwJosh GuyKamau NickersonLucian Voicu April 23, 2008 – Final Presentation
Agenda • Overview • Room by Room Results • Original Goals • Recommendations • Timeline / Costs • Questions / Discussion
Training Lab • Fixed Ethernet cable and port twice • Updated Java, Flash Player, Adobe Reader, Mozilla Firefox • Removed viruses / malware from computers • Fixed printer settings • Repaired/replaced floppy drives
Storage Room • Removed unnecessary / broken systems and monitors. Grouped cables and accessories
Individual Offices • Ms. Baker, Ms. Walker, Ms. Jackson, Ms. Bridget • Replaced computers • Migrated data from old systems • Moved documents to server • Set up network printers
Conference Room • Fixed local printer • Rewired cable hanging from ceiling • Set up all surrounding network printers on computer
Server Closet • Reconfigured T1 router • Set up Internet filtering gateway • Set up Wireless network • Rewired Internet connection to Conference Room
Job Counseling Office • Fixed the printer in Job Counseling multiple times • Fixed wall cabling and rewired ports correctly • Set up new phone • Replaced Ms. Jean’s computer and migrated data • Turned off power buttons on computers while on • Replaced 5 floppy drives
Teen Lab • Repaired two of the computers • Reformatted computers • Reinstalled Windows XP Professional • Replaced hard drives with larger capacity drives • Protected computers with SteadyState • Replaced network cables • Replaced mice and keyboards
Pre-Teen Lab / Childcare Room • Formatted computers • Reinstalled Windows XP Professional • Installed games • Protected with SteadyState • No Internet access • Set up Young Explorer Lenovo computer with integrated desk, seat, and waterproof keyboard
Websites • Web service donated by SchoolWorld ($40/yr value) • Easy to Update • Awaiting approval from Board of Directors • atlantadayshelter.org AND adswc.org • Help manual service donated by PBWiki ($25/mo value) • Control access to sensitive data
Server • Repaired permissions to deny unauthorized access • Repaired defragment schedules on all drives • Cleaned up space on drive C due to low disk space • Backed up database
Spring 2008 PC & Facility Goals PC Support Create an Online Support Manual Reconfigure Teen Lab Add an Internet Content Filter Label computer equipment Facility Improvements Fix the switching closet’s overheating problem Reroute exposed Ethernet wires around the shelter Begin sorting through the donated computers
Spring 2008 Process & Website Goals Process Improvements Add signage to guide clients Solicit donation of flash drives Organize the software and documentation Investigate alternative email options to CBeyond Website Make the website easier to find online Choose a user-friendly website production system that allows for easy modifications
Network Recommendations CBeyond The Shelter is currently paying $821.19/month The Shelter can save (Up to $318/month): $68.00/month if directory assistance is not used Alternately can use 800-GOOG-411 free Reconsider phone lines (5 lines= $200/month) Remove Secure VPN Network Usage Saving to the network makes files easy to access anywhere in the shelter
Miscellaneous Recommendations Website Identify resource to maintain Website Discuss PayPal integration with Board of Directors Thank You Letters PBWiki SchoolWorld
Schedule • Milestones • Teen Lab completion – March 31, 2008 • Gateway update – April 7, 2008 • Facility wiring completion – April 7, 2008 • Website completion – April 21, 2008 • Transition • Familiarizing staff with changes – Week of May 2, 2008
Still to Do Disable K9 Web Protection Fix Server - Now Permissions Release Space on C Drive Dynamic Lists on Wiki
Future Work Server repairs Redundant power supply RAID controller battery Re-partition drive space Reset Permissions, users, computers Set up backup system for server Install exhaust fan in server room Set up dummy cameras outside building Run additional data cable from offices to server closet Get USB flash drives for staff