Transnet Divyesh Kalan General Manager: Commercial

Transnet Divyesh Kalan General Manager: Commercial. 9 March 2011. Discussion. General GFB. 1. 2. Coal ramp up best practice. General GFB. 1. Background Industry and TFR engagement Performance & Constraints Block trains PSP’s. 1. Richards Bay Coal Line. Richards Bay Coal Line.

ariana-dyer
Download Presentation

Transnet Divyesh Kalan General Manager: Commercial

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Transnet Divyesh KalanGeneral Manager: Commercial 9 March 2011

  2. Discussion General GFB 1 2 Coal ramp up best practice

  3. General GFB 1 • Background • Industry and TFR engagement • Performance & Constraints • Block trains • PSP’s

  4. 1 Richards Bay Coal Line Richards Bay Coal Line Guarantee Aspiration Quantum leap 70 68 65 ü Mtpa 2010 Forecast derailment Industrial Action 65 70 65 70 ü 66 Mtpa Mtpa 63 Delivered Force Majeure Derailments Total Guaranteed Guaranteed 2010 Forecast 2010 Actual 2011 Forecast

  5. Scheduling challenges Mine Rail RBCT Port Integrated Supply Chain Management ? • Visibility • Information Flow TPT Loading Equipment TPT Loading Equipment Labour Coal Availability ü 81mtpa ramp up Crew Traction Infrastructure ü ü ü Maputo/DBT ESKOM

  6. Improvement Levers Richards Bay Coal Line 81 mtpa & beyond 85.8 81.7 a d b c Lever Baseline Improve/ redesign SOC Increase wagon fleet size/ availability Implement 100% book-offs Top up all trains Improve ERM yard processes Reduce loco losses Reduce TAT in 2279/ RBCT Reduce infra losses Reduce mine can-cellations Improve TAT at mines Reduce derailm. Target with conting. 5% execution conting. Total Implement 100% Crew Book-off a Reduce Infra losses c Increase fleet size b d Reduce Loco losses

  7. Short term planning High Rail Performance Low Rail Performance 1 Better rail/mine understanding Train Availability Train Availability 2 Improved communication Processes ACTION Coal 3 Coal Improved forecasting 4 Shorter cycle forecasting • COT • 3 month forecasts • TFR ; Mine ; RBCT performance

  8. Our Message…. • Contract finalisation • BEE Access Consideration • Collaboration with Coal Industry and RBCT • Transnet priority • Employees want to win and succeed • Good relationship and team spirit with all stakeholders. ü 2011 ü 70 ü RBCT ü ü ü Sustainable Predictable Reliable Executable Efficient Effective Capital Operational

  9. Thank You