1 / 10

Storage Capacity Auction - SW Spread Price Based Product

Participate in the September 2017 auction for a fast and reliable storage capacity product with a maximum withdrawal rate of 2800 MWh/day and a maximum injection rate of 2.050 MWh/day. Contract duration is 1-5 years starting from April 1, 2018.

ariellej
Download Presentation

Storage Capacity Auction - SW Spread Price Based Product

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 10/2017_Storage Capacity Auction_SW Spread Price Based Product MND Gas Storage a.s. September, 2017

  2. Auction bundle - Basic data Capacity110GWh Max. withdrawal rate 2800 MWh/day Max. injection rate 2 050 MWh/day Contract duration 1 - 5 storage years (start 1.4.2018) Network OperatorNet4Gas Type ofProduct Fast 50/70 Multicycle Financial Deposit 0,15 EUR per eachrequested MWh (max. 16 500 EUR)

  3. Storage Fee_SW Spread based PU = SW Spread + K; PU … unit price€/MWh/storageyear SW Spread… determined during the index period and inserted into the formula. The spread is determined for each day of this period for which the required forward quotations at NCG market are published in ICIS European Spot Gas Markets (ESGM) SW Spread= (Bid NCG winter + Offer NGC winter)/2 – (Bid NCG summer + Offer NCG summer)/2; SW SpreadMIN = 1,20 €/MWh From the sum of the SW spreads determined each day (according to thepriceformula) the rounded arithmeticalaverage is then calculated.SW Spreadaverageisroundedfor 2 decimalnumbers, where 0,01-0,05 = 0,05 and 0,06-0,09 = 0,1 Index period: November 2017 – March 2018 K … represents a progression coefficientaccording to storagecapacityauctionresult; K = +0,05€/MWh at the beginning of storage capacity auction; Auction step = 0,05 € /MWh

  4. Variable Fee Depending on the working gas volumes injected by the customer, there is an additional variable fee. 0,35 € per 1 MWh of injected working gas

  5. Withdrawal Product Curve

  6. Injection Product Curve

  7. Unbudled services 1/3 Daily Firm Capacity Can be added  to the capacity on top of your existing contract gd … gasday Daily firm capacity can be reserved up to 90 days in advance

  8. Unbudled services 2/3 Daily Interruptible Capacity Available interruptible capacity depends on actual nominations for firm storage capacity and technical capabilities of storage.  Available interruptible capacities are shown on web pages of MND Gas Storage: http://www.gasstorage.cz/en/operation-information gd … gasday

  9. Unbudled services 3/3 Temporaryworkinggasvolume • canbeadded  to the WGV on top of your existing contract

  10. Other services Commercial Dispatching of MND Gas Storage Germany offers you purchase of transportation capacities on behalf of your company in accordance with customer‘s needs (quarterly, monthly, day – ahead capacities). Price = flat rate + variable rate(based on purchased MWh)

More Related