1 / 6

ENTGENI and OFUW Spiral 2 Year-end Project Review

ENTGENI and OFUW Spiral 2 Year-end Project Review. University of Washington PI : Arvind Krishnamurthy, Clare Donahue, Tom Anderson Staff : Vjeko Brajkovic Students : Colin Dixon, Hardeep Uppal , Dane Brandon Aug 25, 2010. Project Summary.

arlais
Download Presentation

ENTGENI and OFUW Spiral 2 Year-end Project Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENTGENI and OFUWSpiral 2 Year-end Project Review University of Washington PI: Arvind Krishnamurthy, Clare Donahue, Tom Anderson Staff: VjekoBrajkovicStudents: Colin Dixon, HardeepUppal, Dane Brandon Aug 25, 2010

  2. Project Summary • Deploy OpenFlow networking in the CS building at Univ. of Washington • Support research and production use on the same testbed • Develop components for experimenting with the placement of networking functionality • (E.g., at the edge on end-hosts or in the core using software programmable routers) INSERT PROJECT REVIEW DATE

  3. Milestone & QSR Status INSERT PROJECT REVIEW DATE

  4. Accomplishments Advancing GENI Spiral 2 Goals • Deployed OpenFlow 1.0 with support for slicing of production traffic along with experimental traffic • Deployment includes both wireless and wired users; 4 OpenFlow switches and multiple WiFi access points. • Setup cross-campus experiments using Layer-3 connectivity • Plug-n-Serve: Stanford and UW at GEC-7 • Aster*x: Stanford, UW and two other campuses at GEC-8 • Developed trusted computing components for pushing network management functionality into end-hosts • Developed network management modules for distributed topology mapping, sensing resource demands, etc. INSERT PROJECT REVIEW DATE

  5. Issues • None at this point. INSERT PROJECT REVIEW DATE

  6. Plans • Increase the number of production users, scale up the number of OpenFlow switches in the deployment • Establishing layer-2 connectivity using a dark fiber to the Pacific GigaPoP • Establish multiple demos using the deployment at UW and other campuses: • A wide-area load-balancing system • Real-time diagnoses and troubleshooting of wide-area networking problems • Developing an “operating system” for networks: • Distributed NOX controller • Distributed resource allocation mechanisms • Software defined networking implementations of NAT, TCP accelerators, Deep Packet Inspection, etc. INSERT PROJECT REVIEW DATE