SESAR and ASAS Opportunity

SESAR and ASAS Opportunity. Bob Graham EUROCONTROL Experimental Centre. Presentation Overview. SESAR Concept Focus Opportunity for ASAS Challenges to overcome. SESAR.

arleen
Download Presentation

SESAR and ASAS Opportunity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SESAR and ASAS Opportunity Bob Graham EUROCONTROL Experimental Centre

  2. Presentation Overview SESAR Concept Focus Opportunity for ASAS Challenges to overcome

  3. SESAR The objectives of SESAR are to eliminate the fragmented approach to ATM, transform the European ATM system and synchronise the plans and actions of the different partners and federate resources. SESAR is structured in three major phases: • Definition Phase (2005-2008 – complete with delivery of the ATM Master Plan) • Completed Development Phase (2008-2013 – under management of the SESAR JU) • Started Deployment Phase (2014-2020 – implement the results of the Development Phase)

  4. SESAR Definition - Delivered ..

  5. SESAR Development – Joint Undertaking To manage the development phase a legal entity was created, under European Community law, on 27th of February 2007: The SESAR Joint Undertaking. The aim of the Joint Undertaking is to ensure the modernisation of the European air traffic management system by federating research & development efforts in the Community. As such, it will organise and coordinate the development activities of the SESAR project, in accordance with the ATM Master Plan. WWW.SESARJU.EU

  6. SESAR JU: Work Programme

  7. An example .. Structuring the conceptAn integrated and concept driven approach WP16 WPA / B / C WP9 / 11 WP7 / 13 WP4 / 10 ToC ToD WP5 / 10 WP5 / 10 WP8 / 14 WP6 / 12 WP6 / 12

  8. Integrated High Performance ATM • Three key enablers: Time, Arrival Runway based and globally agreed 4D Trajectory definition. And ….. • A clear focus on safety, efficiency, predictability and reduced emissions; • An agreed common “Time” reference to match the need for precise predictability at the arrival runway with the Airport airside turn-around integrated into ATM; • Globally defined and agreed 4D trajectory exchange format; • Common shared data and information network providing for collaboration between partners; • Strategically and tactically planned business from gate to gate based on collaboratively agreed business/mission trajectory; • Establishment of ATM as an enterprise system where airspace users participates as performance partners and the aircraft is fully integrated into as a component of the system. “… and the aircraft is fully integrated as a component of the system.”

  9. Dynamic DCB TBO UDPP Turn Around NOP SWIM CTA ADD AWO CDA CCD Tailored TMA i-RWY An example .. Performance Based Operations TBO 2 Structuringthe conceptAn incremental approach DCB – Dynamic Demand Capacity Balancing CTA – Controlled Time of Arrival ADD – Aircraft derived Data CDA – Continuous Descent Arrival CCD – Continuous Climb Departure i-RWY – Integrated Runway Management TBO 1 Trajectory Based Operations S T E P 2 Time Based Operations S T E P 1 TBO – Trajectory Based Operations NOP – Network Operations Plan AWO – All Weather Operations UDPP – User Defined Priority Process 2009 2012 2017 2020

  10. ToC ToD Arrival Slot Departure Slot ASAS: ATSA SURF ASPA S&M ATSA ITP Structuring the conceptTimeBased Operations An example .. High Level Free Routing User Preferred Routing Dynamic Demand & Capacity Balancing “Rolling” Network Operations Plan Initial 4D Operations Controlled Time of Arrival Data Link – Aircraft Derived Data Integrated Arrival and Departure Management Continuous Climb Departure P-RNAV & RNP Vortex Departure Separations & Cross wind operations Continuous Descent Arrival Time Based Spacing Vortex Spacing Advanced Flexible Use of Airspace Low Visibility Procedures Turnaround Brake to Vacate Routing > 2012

  11. ToC ToD ASAS: ASEP S&M ASEP C&P ASEP ITP Structuring the conceptTrajectoryBased Operations An example .. An example .. Free Routing between TOC & TOD Flexible : Dynamic military airspace Dynamic ATFM using the RBT Network Operations Plan integrated with SWIM Trajectory Based Operations Reference Business & Mission Trajectories Trajectories revised by Data Link Tailored Terminal Airborne and Ground Operations Performance based navigation with trajectory “tubes” Conflict Free trajectory clearances for pre-defined segments - PTC Multi Airport arrival & departure Management Multiple Trajectory Constraints Gate, Surface and Runway management is integrated User Defined Priority Process Network Wide Management using Shared and Business trajectories Supported by air ground exchanges and SWIM. > 2017

  12. ASAS: SSEP Structuringthe conceptPerformanceBased Operations An example .. An example .. Free Routing between TMA Dynamic military mobile areas Airspace Continuum & Two Categories Network Operations Plan integrated with SWIM Trajectory Based Operations User Preferred Trajectories Trajectory Management Requirements and full SWIM enable the Business Trajectory and dynamic Network Operations Plan Integrated Multi Airport arrivals and “tubes in space” Pilot manages time based and vortex spacing User Defined Priority Process LVP with Synthetic Vision Systems LVP with Synthetic Vision Systems > 2020

  13. ASAS Opportunity: In the concept Service Level 0 & 1 (to 2012) • ATSAW in flight and on the surface • ATSA: ITP and ATSA: VSA • Manual ASAS S&M Service Level 2 & 3 • ASPA: S&M (2015) • ASEP: ITP (2020) Service Level 4& 5 (2020+) • ASEP: C&P • ASEP: Self-Sep

  14. ASAS Opportunity: In the Work Programme We can anticipate continuation or new projects on the following: ATSA: ITP Trials ATSA: ITP & ASEP – ITP (Oceanic in trail procedures) ASEP: Cooperative Separation ASEP: Self Separation in Mixed Mode ASEP: Separation Task in En Route Trajectory based environment ASEP: Compatibility between 4D Contract and ASAS Self Separation ASPA: S&M and ASAS Airport related separation minima (Setting targets for possible reductions in selected separations based upon enablers and technological improvements such as RNP, RSP, ASAS, etc.)

  15. ASAS Opportunity:Initial Weighting on SESAR early benefits EC Council CommunicationOctober 2008 The SESAR JU is encouraged to “to identify, at an early stage, existing and validated technical solutions that can serve as a basis for early deployment to secure early benefits.”

  16. Maturity Requirements and Standards Processes are applied • ASAS TN –ongoing maturity assessment • Highest: ADS-B-NRA (operational Australia) • Lowest: ASEP-VC&P • Fastest: ASPA-S&M (UPS M&S operational approval) • This symposium will report what has to be done ASAS Opportunity:Maturity & Process already applied Maturity e.g. ATC surveillance in non-radar areas

  17. Challenges to Overcome • Compatibility & Co-existence of concepts e.g. Trajectory Based Operations • Cost & Benefit – the economic climate • Global interoperability • The killer application to break the ice? S&M?

  18. I wonder, in our ASAS TN meeting in Rome, 2013 … what will we be saying? Thank You