1 / 12

SESAR Project 10.7.1

SESAR Project 10.7.1. Enhanced Datalink Features for all phases of flight. SESAR presentation. THALES in SESAR. Major player in System Work Packages WP10 En-Route & Approach ATC Systems (Co-leader & main contributor) WP14 SWIM (Co-leader & main contributor)

dewey
Download Presentation

SESAR Project 10.7.1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SESAR Project 10.7.1 Enhanced Datalink Features for all phases of flight

  2. SESAR presentation Air Systems Division

  3. THALES in SESAR • Major player in System Work Packages • WP10 En-Route & Approach ATC Systems (Co-leader & main contributor) • WP14 SWIM (Co-leader & main contributor) • WP15 CNS Systems (Co-leader & main contributor) • Major player in WP12 Airport Systems & WP9 Aircraft Systems (Avionics) • Significant participation in related Operational Work Packages • WP4 En-Route Operations • WP5 TMA Operations • WP6 Airport Systems • WP8 Information Management • Substantial participation in • WP3 Validation Infrastructure • WPB Target Concept and Architecture Maintenance Air Systems Division

  4. Project 10.7.1 – Enhanced Datalink • Objective : Develop and verify Pre-SWIM enhanced datalink services, compliant with the WG-78/SC-214 standard in all environments (En-Route, Approach and Airport ground systems) • Leader : Thales Air Systems Division

  5. Project 10.7.1 – General Structure • ATC system specifications supporting enhanced ATS Datalink applications • Prototypes development • Prototype 1 (Indra/Selex/Eurocontrol) Development and Verification • Selex instance dedicated to Airport domain • DLIC, ACM, DCL, D-TAXI, D-OTIS (only D-ATIS) • Indra instance dedicated to Approach and En-Route domains • DLIC, ACM, AMC, ACL, 4DTRAD • Eurocontrol instance (MUAC) dedicated to i4D • DLIC, ACM, AMC, ACL, 4DTRAD • Prototype 2 (Thales) Development and Verification • Thales prototype dealing with all domains • DLIC, ACM, AMC, ACL, DCL, D-TAXI, 4DTRAD, ATSA-ITP, D-OTIS • Support to standardisation (SC214/WG78) Air Systems Division

  6. 9.33 Relationship with other SESAR projects OPS WPs 10.2.1 10.9.4 10.7.1 WP4 12.3.3 12.4.3 Delivery for Validation Air Systems Division Requirements WP5 WP6

  7. WG78/SC214 Legacy Datalink (standard) Enhanced Datalink Phase1 Enhanced Datalink Phase2 Operational WPs Project approach Operational requirements SPR & INTEROP Rev H Air Systems Division

  8. Draft schedule 2010 2011 2012 2013 2014 2015 T0 Phase 1: Functional assumptions Validation plan Trials Validation results Phase 2: Functional assumptions Air Systems Division Validation plan Trials Validation results

  9. Issues • Time schedule for standard validation • First validation results will not be available end of 2011 • Phase 1 : beginning of 2012 • Phase 2 : End 2013 • SC214/WG78 validation end date should be pushed to at least mid 2013 to get validation results feedbacks from P10.7.1 • Synchronisation with Airborne projects • Implemented INTEROP shall be the same • PDRs assessment needs to be done • A unique ASN.1 baseline from RevH + PDRs needs to be shared • Schedule for validation exercises • ASAS is not part of current SC214/WG78 TORs • 9.5 & 9.6 for airborne systems • 10.3 for ground systems Air Systems Division

  10. Opportunities • Flight tests and ATC shadow mode with other partners • Trajectory exchange (i4D/4DTRAD) with 10.x.y / 4.x.y / 5.x.y / 9.1 • FDPS trajectory enhancement • Controller HMI improvement • Conformance monitoring (e.g. FLIPCY) • AMAN integration for RTA/CTA in approach • Taxi Route clearances (D-TAXI) with 12.x.y / 6.x.y / 9.13 • Controller HMI and FDPS enhancement • D-TAXI text vs. D-TAXI graphical and ground HMI representation • Link with Departure clearance (DCL) • Additional FIS services validation • D-HZWX and D-RVR not in SESAR scope • Could be part of a later need: • SESAR operational needs have to be identified • SC214/WG78 SPR & INTEROP shall be clear enough for implementation Air Systems Division

  11. Contacts THALES Air Systems S.A.Parc Tertiaire Silic 3, avenue Charles LindberghBP 20351 94628 RUNGIS Cedex FRANCE Point of contact: Pascal ROHAULT E-mail: pascal.rohault@thalesgroup.com Tel: +33 (0)1 79 61 49 19 Thierry COURDACHER E-mail: thierry.courdacher@thalesgroup.com Tel: +33 (0)1 79 61 36 98 Air Systems Division

  12. Thank you for your attention

More Related