An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ANT INTEGRATED INITIATIVE and P-RNAVSTATUS REPORT Terry Symmans DAS/AFN EUROCONTROL ANT/37

  2. ANT INTEGRATED INITIATIVE vis-à-vis P-RNAV • Primary aim to reduce variety of potentially confusing TMA procedures in ECAC • At present, many different types with differing requirements (e.g. B-RNAV, B-RNAV+, GPS, FMS, Sequence of Waypoints, P-RNAV) • Target is P-RNAV for all RNAV procedures (some limited B-RNAV applications with specific design requirements are accepted) • States have committed to providing at least one conventional procedure until 2010 ANT/37

  3. P-RNAV ISSUES • EASA Data Suppliers’ Accreditation Process and Letter of Acceptance (LoA) • FAA Data Suppliers’ Acceptance (AC 20-DB) and LoA • Operator Approval (Current and Planned) • State P-RNAV Implementation Progress ANT/37

  4. STAGE JEPPESEN (GERMANY) LUFTHANSA FLIGHT NAV (SWITZERLAND) EAG (UNITED KINGDOM) Submit Application and Exposition 15 March 05 15 April 05 7 March 05 EASA review of Exposition EASA conducts 1st Audits 2/3 June 05 16/17 June 05 17/18 May 05 Rectification (as necessary) EASA commitment to issue LoAs by EASA ACCREDITATION As required ‘Minors’ early July 4th August 2005 (3 AIRAC cycles pre 27th October) ANT/37

  5. FAA ACCREDITATION • P-RNAV document (AC 90-96A) published 12th January 2005 • FAA LoA Directive (AC 20-DB) completed end 2004 • AC 20-DB with FAA Legal Department prior to publication • Applications for FAA LoAs are now being invited – approx 18 applicants expected ANT/37

  6. 798 P-RNAV Approved Aircraft from 15 Operators ANT/37

  7. Compliant COMPLIANCE WITH ANT TARGETSITUATION June 2005 ANT/37

  8. Compliant Compliant by Oct 2005 PROJECTED COMPLIANCE WITH ANT TARGETSITUATION by 27 Oct 2005 ANT/37

  9. Not (fully) Compliant Compliant Compliant by Oct 2005 PROJECTED COMPLIANCE WITH ANT TARGETSITUATION by Oct 2005 ANT/37

  10. Implemented P-RNAV STATUS AND PLANNING as at end Apr 05 ANT/37

  11. % Dependent Implemented November 2005 2006 - P-RNAV STATUS AND PLANNING as at end Apr 05 ANT/37

  12. P-RNAV IMPLEMENTATION AND PLANNING ANT/37

  13. ANT/37

  14. INTEGRATED INITIATIVE CONCLUSIONS • 71% of States now compliant • Possibly 85% by October 2005 provided LoAs awarded/Operator Approvals situation improves • Good progress on EASA Data Suppliers’ LoAs but still waiting for FAA LoA to be formally adopted ANT/37