100 likes | 114 Views
Help Wellton Elementary School by purchasing and installing a playground structure for pre-school and elementary children. Also includes repurposing a swing set, installing a shade structure for the play gym, and painting a map of the USA outside the cafeteria. Project dates: December 11th, 12th, and 13th. Addressing outstanding issues and budget limitations.
E N D
Wellton Elementary School / Fort Yuma Rotary Project29126 San Jose Ave, Wellton, AZ 85356
Fort Yuma RotaryWellton Elementary School Project Purchase and install a playground structure for pre-school and early elementary children Playground structure Repurposed Swing Set and Slide Shade Structure for Play Gym Set Paint a Map of the USA outside Cafeteria Repaint sidewalk paw prints & hopscotch Project dates: December 11th, 12th & 13th.
Areas designated for Play Structure & Additional Swings – alternate view
Double Swing SetRefurbish, Paint and Install similar style swing set.Swing sets to separate larger play area from the new play structure for pre-school children
Outstanding Issues to be addressed Play Gym structure design to be finalized Swing Set required to be stripped and painted School uses wood mulch for Fall zone material Wood mulch is cost prohibitive vrs Pea Gravel Alternatives are being sought Budget limitations may require to chose between shade structure and fall zone material. Wellton Elementary School / Fort Yuma Rotary Project