1 / 80

TESTING…

TESTING…. Overview. Motivation, Testing glossary, Quality issues, Non-execution-based testing, Execution-based testing, What should be tested?, Correctness proofs, Who should perform execution-based testing?, Testing distributed SW, Testing Real-Time SW, When testing stops? , Summary.

arlo
Download Presentation

TESTING…

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TESTING…

  2. Overview • Motivation, • Testing glossary, • Quality issues, • Non-execution-based testing, • Execution-based testing, • What should be tested?, • Correctness proofs, • Who should perform execution-based testing?, • Testing distributed SW, • Testing Real-Time SW, • When testing stops? , • Summary.

  3. Motivation, • Testing glossary, • Quality issues, • Non-execution-based testing, • Execution-based testing, • What should be tested?, • Correctness proofs, • Who should perform execution-based testing? • Testing distributed SW, • Testing Real-Time SW, • When testing stops? • Summary.

  4. Motivation • SW life cycle models too often include separate testing phase… • Nothing could be more dangerous!, • Testing should be carried continuously throughout the SW life cycle.

  5. Motivation, • Testing glossary, • Quality issues, • Non-execution-based testing, • Execution-based testing, • What should be tested?, • Correctness proofs, • Who should perform execution-based testing? • Testing distributed SW, • Testing Real-Time SW, • When testing stops? • Summary.

  6. Testing – Glossary … • “V & V” VS Testing: • Verification – אימותDetermineif the phase was completed correctly. (Take place at the end of each phase)Boehm: Verification = “Are we building the product right?” , • Validation – תקפותDetermineif the product as a whole satisfies its requirementsTakes place before product is handed to the clientBoehm: Validation = “Are we building the right product?” .

  7. Testing – Glossary (Cont’d) • Warning: • “Verify” also used for all non-execution-based testing , • V&V might implies that there is a separate phase for testing. • The are two types of testing: • Execution-based testing, • Non-execution-based testing, • It is impossible to ‘execute’ the MRD or EPS , • On the other hand, is code-testing enough/efficient for the implementation phases?

  8. Motivation, • Testing glossary, • Quality issues, • Non-execution-based testing, • Execution-based testing, • What should be tested?, • Correctness proofs, • Who should perform execution-based testing? • Testing distributed SW, • Testing Real-Time SW , • When testing stops? • Summary.

  9. Quality … Quality…

  10. Quality (Cont’d) • Quality: • Peculiar and essential character, • An inherent feature, • Degree of excellence, • Superiority in kind , • An intelligible feature by which a thing may be identified.

  11. SW Quality … • In other areas quality implies excellence, • Not here! , • The quality of SW is the extent to which the product satisfies its specifications.

  12. , SW Quality (Cont’d) … • Very often bugs are found as the delivery deadline approaches: Release a faulty product or Late delivery, • Have a separate SW Quality Assurance (SQA) team, • Instead of 100 programmers devoting 30% of their time to SQA activities, Have full-time SQA professionals , • In small company utilize cross-review.

  13. SW Quality (Cont’d) • Managerial independence: • Development group, • SQA group ,

  14. The SQA Team Responsibilities • To ensure that the current phase is correct, • To ensure that the development phase have been carried out correctly, • To check that the product as a whole is correct, • The development of various standards and tools, to which the SW and the SW development must conform, [CMM level?] , • Establishment of monitoring procedures forassuring compliance with those standards.

  15. Motivation, • Testing glossary, • Quality issues, • Non-execution-based testing, • Execution-based testing, • What should be tested?, • Correctness proofs, • Who should perform execution-based testing? • Testing distributed SW, • Testing Real-Time SW, • When testing stops? • Summary.

  16. Non-Execution-Based Testing … • Underlying principles: • Group synergy, • We should not review our own work , • Our own blind-spot, Cover your right eye and stare at the red circle. Then, slowly move away from the page (or if you're already far, move toward the page). As you move away/toward the page (Do not look at the blue star), there should be a point where the blue star disappears from the picture. That is your blind spot!

  17. Non-Execution-Based Testing …

  18. Non-Execution-Based Testing (Cont’d) • Non-execution-Based Testing: • Walkthrough – סקירה, • Inspection – ביקורת, • (Peer-Reviews – סקר עמיתים) ,

  19. Walkthrough – The Team • 4–6 members, representative from: • Specification team member (document author?), • Specification team manager, • Client, • Next team (spec’s clients) , • SQA – chairman of the walkthrough.

  20. Walkthrough – Preparations • Set the team, • Distribute spec in advance, • Each reviewer prepares two lists: • Things he/she does not understands, • Things he/she thinks are incorrect , • Execute the walkthrough session(s).

  21. The Walkthrough Session … • Chaired by SQA (the one who will loose most..):whose roles are: • Elicit questions, • Facilitate discussion, • Prevent ‘point-scoring-session’, • Prevent annual evaluation session,(Remember team leader andteam manager …), • Up to 2 hours sessions, • Might be participant-driven or document-driven, • Verbalization leads to fault finding!, • Most fault are found by the presenter! ,

  22. The Walkthrough Session (Cont’d) • Detect faults – do not correct them!, • Why?, • Cost-benefit of the correction (6 members..), • Faults should be analyzed carefully, • There is not enough time in the session, • The ‘committee attitude.’,

  23. Inspection … • More formal process, with six-stages: • Planning – set the team, set schedule, • Overviewsession – Overview & doc. distribution, • Preparation – learn the spec, aided by statistics of fault types, that is – utilize the organization knowledge base, • Inspection – walkthrough the document, verifying each item. Formal summary will be distributed with summary and ARs. (Action required items: task and due dates), • Rework – fault resolving , • Follow-up – every issue is resolved: fix or clarification.

  24. Inspection (Cont’d) … • Team of five: • Moderator (I.E. – Spec team leader) – מתווך: • Manages the inspection – team and object, • Ensures that the team takes positive approach, • Specification author: • Answers questions about the product, • Reader: • Reads the doc aloud, • Recorder: • Documents the results of the inspection , • SQA, inspector, specialist: • Provides independent assessment of the spec.

  25. Inspections (Cont’d) • Use a checklist of potential faults: • Is each item of the spec correctly addressed?, • In case of interface, do actual and formal arguments correspond?, • Have error handling mechanism been identified?, • Is SW design compatible with HW design?, • Etc. , • Throughout the inspection: Faults recording.

  26. Fault Statistics • Recorded by severity and fault type. • Major.. (Premature termination, DB damage, etc..), • Or minor , • Usage of the data: • Compare with previous products, • What if there are a disproportionate number of faults in a specific module?, • Maybe – redesign from scratch?, • Carry forward fault statistics to the next phase , • Not for performance appraisal!

  27. Inspection – Example [Fagan 1976] • 100 person-hours task, • Rate of two 2-hours inspections per day, • Four-person team, • 100/ (5*4) = 5 working days, • 67% of all faults were detected before module execution-based testing! , • 38% fewer faults than a comparable product.

  28. Statistics on Inspections • 93% of all detected faults (IBM, 1986), • 90% decrease in cost of detecting fault (switching system, 1986), • 4 major faults, 14 minor faults per 2 hours (JPL, 1990). Savings of $25,000 per inspection , • Number of faults decreased exponentially by phase (JPL, 1992).

  29. Review Strengths and Weaknesses • Strengths: • Effective way of faults detecting, • Early detection, • Saving $ , • Weaknesses: • Depends upon process adequate (הולם, מספיק) , • Large-scale SW is extremely hard to review(unless modularity concept – OOP), • Depends upon previous phase documents , • Might be used for performance appraisal.

  30. Metrics for Inspections • Fault density: • Faults per page or – • Faults per KLOC, • By severity (major/minor), • By phase, • Fault detection rate (e.g. Faults detected per hour), • Fault detection efficiency (e.g. Faults detected per person/hour) , • What does a 50% increase in the fault detection rate mean?

  31. Motivation, • Testing glossary, • Quality issues, • Non-execution-based testing, • Execution-based testing, • What should be tested?, • Correctness proofs, • Who should perform execution-based testing? • Testing distributed SW, • Testing Real-Time SW, • When testing stops? • Summary.

  32. Execution-Based Testing • Definitions: • Failure (incorrect behavior), • Error (mistake made by programmer), • Nonsensical statement: • “Testing is demonstration that faults are not present.” , • Dijkstra: • “Program testing can be very effective way to show the presence of bugs, but it is hopelessly inadequate for showing their absence” [Dijkstra, 1972] ,

  33. What Is Execution-based Tested? • “The process of inferring certain behavioral properties of product based, in part, on results of executing product in known environment with selected inputs.” [IEEE 610.12, 1990], • Troubling implications: • Inference – היסק, היקש . • Trying to find whether there is a black cat in a dark room. • Known environment? • Neither the SW nor the HW are really known, • Selected inputs: • What about RT systems? (e.g. Avionic system) ,

  34. Motivation, • Testing glossary, • Quality issues, • Non-execution-based testing, • Execution-based testing, • What should be tested?, • Correctness proofs, • Who should perform execution-based testing? • Testing distributed SW, • Testing Real-Time SW, • When testing stops? • Summary.

  35. But What Should Be Tested? • Utility – תועלת , • Reliability – אמינות , • Robustness – חוֹסֶן , • Performance – ביצועים , • Correctness – נכונות .

  36. Utility – תועלת • Utility – the extent to which user’s needs are met when a correct product is used under conditions permitted by its specification, • Does it meet user’s needs? • Ease of use, • Useful functions, • Cost-effectiveness, • Utility should be tested first, and if the product fails on that score, testing should be stop ,

  37. Reliability –אמינות • Reliability – A measure of the frequency and criticality of product failure, • Frequency and criticality of failure: • MTBF – Mean Time Between Failures, • MTTR – Mean Time To Repair, • Mean time, cost to repair results of failure, • Suppose our SW fails only one every six month,but when it fails it completely wipes out a database. The SW can be re-run within 2hr.,but the DB reconstruction might take a week ,

  38. Robustness – חוֹסֶן … • Range of operating conditions:Possibility of unacceptable results with valid input,Effect of invalid input , • A product with a wide permissible operating conditions is more robust than a product that is more restrictive.

  39. Robustness – חוֹסֶן(Cont’d) • A robust product should not yield unacceptable results when the input satisfies its specifications , • A robust product should not crash when the product is not under permissible operating conditions ,

  40. Performance – ביצועים • Extent to which space and time constraints are met, • Real-time SW – hard-time constraints:Can the CPU process an image data within 5ms? (For a 200hz sampling rate?) ,

  41. Correctness – נכונות • A product is correct if it satisfies its output specifications, independent of its use of computing resources, when operated under permitted conditions ,

  42. Motivation, • Testing glossary, • Quality issues, • Non-execution-based testing, • Execution-based testing, • What should be tested?, • Correctness proofs, • Who should perform execution-based testing? • Testing distributed SW, • Testing Real-Time SW, • When testing stops? • Summary.

  43. Correctness Proofs (Verification) • Mathematical technique for showing that a product is correct, • Correctness means – It satisfies its specifications , • Is it an alternative to execution-based testing?

  44. Specifications Correctness … • Specification for a sort: • Are these good specifications?, • Function trickSortsatisfies these specifications:

  45. Specifications Correctness (Cont’d) • Incorrect specification for a sort: • Corrected specification for the sort:

  46. Correctness • NOT sufficient – as was demonstrated in previous example , • NOT a showstopper – consider a new compiler that is: • Twice faster, • Object code is 20% smaller, • Object code is 20% faster, • Much clearer error-code messages, • But – A single error message – for the first ‘for’ statement encountered in any class , • Will you use it?

  47. Correctness Proofs – Glossary • An assertion is:A claim that a certain mathematical property holds true at a given point, • An invariant is:A mathematically expression that holds true under all conditions tested , • An input specification is:A condition that holds true before the code is executed.

  48. , Example of Correctness Proof … • Code to be proven correct.

  49. Example (Cont’d) … • Flowchart of code segment:

  50. Example (Cont’d) …