An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A collaboration with ORNL / PPPL Scraper Element Collaboration Arnie Lumsdaine Jeff Harris 3/3/2011

  2. A collaboration with ORNL / PPPL Background • The W7-X stellarator will begin operation in 2015 with an inertially cooled divertor which will allow short pulse operation for two years. • In 2017, an actively cooled divertor will be delivered (in 10 divertor units) that should allow for steady-state operation. • In order to protect divertor target elements and pumping gap, a Scraper Element has been proposed to be placed in each divertor unit.

  3. A collaboration with ORNL / PPPL Scope of Collaboration • The US, led by ORNL will produce a detailed engineering design. • The US will also investigate whether the proposed design raises any physics issues which could compromise the operation of the machine. • IPP will be responsible for the prototype, and for the procurement of the final elements.

  4. A collaboration with ORNL / PPPL Schedule • The work should be completed by mid CY2012 – earlier if at all possible. • The US will have a draft Gantt chart completed by March 19.

  5. A collaboration with ORNL / PPPL IPP Schedule

  6. A collaboration with ORNL / PPPL IPP Schedule

  7. A collaboration with ORNL / PPPL Preliminary Work Plan