70 likes | 220 Views
Pre-Ship Review. OMPS Proto-Flight Model (PFM) Delta Pre-Ship Review ( D PSR). 6 November 2008 Boulder, Colorado. Delta PSR Agenda. Pre-Ship Review. ITAR Statement. Pre-Ship Review.
E N D
Pre-Ship Review OMPS Proto-Flight Model (PFM)Delta Pre-Ship Review (DPSR) 6 November 2008 Boulder, Colorado
Delta PSR Agenda Pre-Ship Review
ITAR Statement Pre-Ship Review • Data provided during this review may be controlled under United States export control laws. Therefore, Ball Aerospace will not knowingly export this information without prior review and authorization. In this context, export includes providing the information to other than an “Authorized U.S. Citizen” who is “In the U.S.” as defined by ITAR regulations. • You are not authorized to attend this meeting if: • You are not an American Citizen nor a lawful permanent resident of the U.S. • You work for a foreign company or government or in a foreign location, even if you are a U.S. citizen
PSR Introduction DPSR Introduction Scott C. Asbury, PMP OMPS Program Manager
PSR Purpose ─ Demonstrate OMPS PFM is Ready for Delivery PSR Introduction • Nadir Science-Grade Algorithms – Dec ’02 (Delivered) • Limb Science-Grade Algorithms – Mar ’03 (Delivered) • Proto-Flight Model (PFM) for NPP – 20 Oct ’08 (19 Sep ’08 Goal) • One (1) Telemetry Simulator (FVS) for NPP – Mar ’05 (Delivered) • Three (3) Telemetry Simulators (FVS) – Jul ’05 (Delivered) • Deliverable EGSE & GSE – 15 Feb ’11 (27 Dec ’10 Goal) • Flight Model 2 (FM2) for NPOESS – 15 Feb ’11 (27 Dec ’10 Goal) • One (1) High-Fidelity Simulator (EEM) – 1 Mar ’10 • Two (2) Instrument Test Operator Consoles (ITOCs) – 1 Mar ’10 & 15 Feb ‘11
PSR will Demonstrate OMPS Readiness to Ship PSR Introduction • OMPS PFM Ready for Delivery to NGST for NPP Integration • Flight hardware and software is complete and ready • Planned & contractually required acceptance testing is complete • All 967 requirements verified and approved by BATC, NGST, IPO and NASA • All waivers submitted and approved by NGST and SEWG • Open Liens from PSR Addressed • All category 1 liens (gate to delivery in place) are closed • The category 2 lien (gate to IIRR) is closed • Category 3 liens (gate to EIDP) are closed, with the exception of: • 6 action items: responses provided – awaiting customer concurrence • 1 PSR checklist item: DD-1149 – NGST action • Issues Since PSR Have Been Addressed and Residual Risk is Understood • All residual risks are low to moderate, with the majority being low • FCA/PCA Completed Ahead of the 10 Nov ’08 Baseline Plan