70 likes | 286 Views
Miranda Wells DKS Associates. Bi Tran 2033 Emulator. Project Background: Model was developed for the City of Pasadena 12 intersections proposed for ATCS 29 signalized intersections modeled AM, Midday, and PM peak hours studied Model included Gold Rail light rail system.
E N D
Miranda Wells DKS Associates Bi Tran 2033 Emulator
Project Background: • Model was developed for the City of Pasadena • 12 intersections proposed for ATCS • 29 signalized intersections modeled • AM, Midday, and PM peak hours studied • Model included Gold Rail light rail system
Client Requirements • Must have all the existing functions provided in the field software • Must be able to edit signal timing through VISSIM interface • Must allow simulation to run faster than real-time
System Architecture Developed by McCain
Development Process Develop Requirements Documentation Port Software Develop API Test Emulator Fix Bugs Use Emulator for Analysis