An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MCWG outlook for 2012 + H4IRRADR2E Project Meeting – 19th January 2012 M. Calviani (EN/STI) for the MCWG and R2E Mitigation Project

  2. MCWG priorities • Outstanding priorities: • Display radiation levels on the Dashboard – slowly moving towards automatic implementation • RadMon monitoring follow-up in case of operational needs • Evolution of beam-gasduring the 25ns MD – try to push towards a “long” MD at the maximum intensity possible • Continuous analysis of TLD data • Understand streaming levels through the movable plugs in P8/4/6 MCWG outlook for 2012

  3. MCWG priorities • Follow-up: • Review of the FLUKA simulation of the UJ14/16 updated shielding and cross-check • Follow-up of P1 RR studies + P1/5 RadMon/PMI cross-checks • Review of UX/US/45/65 FLUKA calculation, taking into account observed pressure spikes • Update of the LHCb geometry and integration with the current US85 – calculation for the LHCb upgrade to 10 fb-1? MCWG outlook for 2012

  4. H4IRRAD • As requested by the SPSC, we have provided a Memorandum justifying the 2012 beam request: • https://cdsweb.cern.ch/record/1414454?ln=en, CERN-SPSC-2012-003 (SPSC-M-777) • We should have been approved for 48 days (out of the 60 requested), i.e. 3 slots of 16 days each (more of less like 2011) • Scheduling still not present  should following the next weeks • PLCs, EN/EL UPS, EN/STI comp. tests, GTOs, power converter-related, QPS develoment (?), BPM development, FGClite, RadMon 2nd generation, etc… • Possible urgent LHC requirements like in 2011 • More info will follow via the h4irrad-users@cern.ch MCWG outlook for 2012