RP 200-13 Introduction Scope Includes aboveground, stationary, shop-fabricated tanks. Does not include field-fabricated storage tanks or storage systems for liquefied petroleum gases, liquefied natural gases or compressed natural gases.
RP 200-13 1. Introduction Emphasizes the Importance of Using Competent Installers
RP 200-13 2. Site Planning Tank Location Tank Configurations Property Lines and Bldgs Tank Spacing Requirements Bases and Foundations Retail Service Stations Commercial Fleet Facilities Marinas (Change) Product Deliveries Traffic Flow SPCC Plan Electronic Equipment Physical Protection Fire Protection Utilities Emergency Planning Change: Added: See RP1000
RP 200-13 3. Foundations, Support and Anchorage General Soil Analysis Foundation Design Excavation Base Course Vertical Tank Bases Horizontal Tank Saddles Reinforced Concrete Slabs Anchoring
RP 200-13 4. Dikes Purpose Dike Capacity Dike Construction Impervious Barrier Dike Penetraions Access Drainage Control Oil/Water Separator
RP 200-13 5. Vaults and Special Enclosures General Vault Design Vault Construction Venting Leak Detection Liquid Recovery Vault Ventilation Collision Protection Electrical Installation Special Enclosures
RP 200-13 6. Tanks General Standards (Changes) Tank Openings Preinstallation Inspection Material Handling Air-and-Soap Test Changes: Deleted UL2244 (Tank System) Added STI F921 (Integral Secondary Containment) Added STI F941 (Fireguard)
RP 200-13 7. Pumps and Valves Materials and Design Pumping Systems Fire/Emergency Valves Block Valves Anti-Siphon Valves Check Valves Pressure Relief Valves
RP 200-13 8. Tank Filling, Gauging, Dispensing and Venting Materials and Design Tank Filling Dispensing Systems Gauging Systems Tank Venting
RP 200-13 9. Aboveground Piping and Fittings General Requirements AST Piping Materials Piping Practices Piping Layout Fittings for AST Piping Testing AST Piping Piping Corrosion Protection
RP 200-13 10. Underground Piping and Fittings General Requirements Piping Materials Piping Practices Layout and Trenches Backfill and Compaction Fittings Corrosion Protection Fiberglass Piping Flexible Piping Containment Sumps Testing Primary Piping Testing Secondary Piping
RP 200-13 11. Corrosion Protection General Applicability Coatings Protection of Buried Components Galvanic CP Impressed-Current Sys Wiring and Electrical Inspection and Testing
RP 200-13 12. Environmental Protection General Release Detection Vapor Recovery
RP 200-13 13. Electrical Installation General Requirements Classifications Electrical Equipment Emergency Shutoff Wiring Intrinsically Safe Grounding and Bonding Ensuring Uninterrupted Power
RP 200-13 14. Testing and Inspection General Test Results Other Testing
RP 200-13 15. Documentation, Maintenance and Training As-Built Drawings Component Documentation Scheduled Maintenance Training
RP 200-13 Appendix A Size Calculations for Dikes
RP 200-13 Appendix B Venting
RP 200-13 Appendix C Code Requirements for ASTs at Motor Vehicle Fuel Dispensing Facilities
RP 200-13 Appendix C Code Requirements NFPA 30A 2012 (2008) IFC 2012 (2006)
RP 200-13 Appendix D Publication Reference