An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Radio Frequency System

  2. Radio Frequency System

  3. Access Rights as they are today for Radio Frequency System (ACN, ACSCA, ADT and APWL classes)

  4. Beam Instrumentation

  5. Access Rights as they are today for BCTs

  6. Radiation Monitoring

  7. Access Rights as they are today for RAMSES

  8. AC Distribution

  9. AC Distribution

  10. Access Rights as they are today for AC Distribution

  11. LHC Access

  12. WorldFip Segments

  13. Access Rights as they are today for WorldFip Segments Jean-Claude Guillaume should not be there ?

  14. 600 A Energy Extraction System

  15. 600 A Energy Extraction System

  16. + step 22-PLI T-open at >= 200A

  17. + properties Opening time: T [ms]Magnet/circuit current level: I [ A ] Maximum extraction resistor voltage: U [ V ]

  18. Access Rights as they are today for 600 A Energy Extraction System

  19. Upload delays have decreased from a few months mid 2006 to a few weeks in 2007

  20. extrapolation Upload Rate up to August 07 and Expectations up to July 08 Minor upload for the endurance tests that should take place in September & Measurements during Powering Tests until July 08 (according to the General Schedule)

  21. 13kA Energy Extraction System

  22. 13kA Energy Extraction System

  23. 13kA Energy Extraction System

  24. 13kA Energy Extraction System

  25. Access Rights as they are today for 13 kA Energy Extraction System

  26. 3 slots are still to be updated in september

  27. Quench Protection System

  28. Quench Protection System

  29. Access Rights as they are today for Quench Protection System

  30. Electrical Quality Assurance for Cold Circuits

  31. Electrical Quality Assurance for Cold Circuits

  32. Access Rights as they are today for ElQA for Cold Circuits

  33. ElQA during assembly should be nearly finished for the whole machine and to be uploaded in Sept.07 ElQA at warm should be gradually finished until Feb. 08 ElQA during cool-down and at cold should progress until April 08

  34. Injection Kicker

  35. Access Rights as they are today for Injection Kickers

  36. Access Rights as they are today for Injection Kickers The MKIs started their commissioning last year and should finish by March 08 and data uploaded by April 08