60 likes | 234 Views
New White Lake Township Library Progress Report , December 12, 2018 – January 13, 2019. Project Status With the winter months ahead, enclosure is the name of the game . Windows, doors, and glass have been installed along with the spray foam insulation associated within the exterior walls.
E N D
New White Lake Township Library Progress Report, December 12, 2018 – January 13, 2019
Project Status With the winter months ahead, enclosure is the name of the game . Windows, doors, and glass have been installed along with the spray foam insulation associated within the exterior walls.
Project Status As we near the end of the window installation, temporary heat has been brought into the building space as we continue to focus on the logistics of the interior.
Project Status With a dry enclosed heated building, many trades are involved at this time. From installing metal stud framing, rough electrical, rough plumbing, to drywall, and installing duct work, the project is busy!
Upcoming Weeks • * Fascia on roof edge • * Drywall installation • * Staining of Wood Trusses and Roof Decking • * Exposed finished Duct work • * Install Fire Suppression • * Stone work at Fire place