1 / 10

Scheduling

Scheduling. Characteristics of a “job”. Constituent operations Due date Time of arrival in shop Starting time Completion time Flow time Lateness. Characteristics of a schedule. Two basic types of scheduling Work-force scheduling Operations scheduling. Operations Scheduling.

asha
Download Presentation

Scheduling

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Scheduling

  2. Characteristics of a “job” • Constituent operations • Due date • Time of arrival in shop • Starting time • Completion time • Flow time • Lateness

  3. Characteristics of a schedule Two basic types of scheduling • Work-force scheduling • Operations scheduling

  4. Operations Scheduling short-term plans designed to implement the master production schedule • job shop • flow shop

  5. Timing of job/operations scheduled (Gantt chart) • Job or activity progress chart • Machine chart For n jobs, each requiring m machines there are (n!)m possible schedules

  6. Measures • Average flow time of jobs • Average lateness of jobs • Makespan • Idle time • Past Due • WIP • Utilization Which of these would Goldratt have said was best?

  7. Scheduling heuristics • FCFS – first come, first served • SPT – shortest processing time • EDD – earliest due date

  8. Information Needed for Scheduling • Question: What information do you feel is needed to accurately schedule an operation?

  9. Scheduling Class Activity At the beginning: 400 birch in inventory 100 cherry past due Equipment is set up for cherry

  10. Scheduling Game Process. • I will give you demand for week • Decide on how much of each type to process – don’t forget open orders & birch forecast! • Record on decision log • Make a feasible schedule (don’t forget setups) • Turn in decision for week to me • When complete wait for actual birch demand for week • Calculate profit/loss – give total to me • Get demand for new week

More Related