Water Quality. Water Resources Planning and Management Daene C. McKinney. Water Quality Management. Critical component of overall water management in a basin Water bodies serve many uses, including Transport and assimilation of wastes

ashanti
Download Presentation

Water Quality

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water Quality Water Resources Planning and Management Daene C. McKinney

  2. Water Quality Management • Critical component of overall water management in a basin • Water bodies serve many uses, including • Transport and assimilation of wastes • Assimilative capacities of water bodies can be exceeded WRT intended uses • Water quality management measures • Standards • Minimum acceptable levels of ambient water quality • Actions • Insure pollutant load does not exceed assimilative capacity while maintaining quality standards • Treatment

  3. Water Quality Management Process • Identify • Problem • Indicators • Target Values • Assess source(s) • Determine linkages • Sources  Targets • Allocate permissible loads • Monitor and evaluate • Implement

  4. Advection Dominated Flow

  5. Water Quality Example • W1,W2 = Pollutant loads (kg/day) • x1, x2 = Waste removal efficiencies (%) • P2max, P3max = Water quality standards (mg/l) • P2, P3 = Concentrations (mg/l) • Q1, Q2,Q3= Flows (m3/sec) • a12, a13, a23, = Transfer coefficients

  6. Water Quality Example

  7. Water Quality Example

  8. Water Quality Example

  9. Water Quality Example • Cost of treatment at 1 greater than cost at 2 (bigger waste load at 1) • Marginal cost at 1 greater than marginal cost at 2, c1 > c2 for same level of treatment

  10. Water Quality Example Cost of treatment at 1 >= cost at 2 marginal cost at 1, c1, >= marginal cost at 2, c1, for the same amount of treatment.

  11. Water Quality Example

  12. Example • Irrigation project • 1800 acre-feet of water per year • Decision variables • xA = acres of Crop A to plant? • xB = acres of Crop B to plant? 1,800 acre feet = 2,220,267 m3 400 acre = 1,618,742 m2

  13. Example xA< 400 xA> 0 10 8 xB< 600 6 xB (hundreds acres) 4 3xA +2 xB < 1800 2 xB > 0 2 4 6 8 10 xA (hundreds acres)

  14. Example xA< 400 xA> 0 10 Z=3600=300xA +500xB (200, 600) 8 xB< 600 6 xB (hundreds acres) Z=2000=300xA +500xB 4 Z=1000=300xA +500xB 2 xB > 0 2 4 6 8 10 xA (hundreds acres)

  15. GAMS Code POSITIVE VARIABLES xA, xB; VARIABLES obj; EQUATIONS objective, xAup, xBup, limit; objective.. obj =E= 300*xA+500*xB; xAup.. xA =L= 400.; xBup.. xB =L= 600.; limit.. 3*xA+2*xB =L= 1800; MODEL Calibrate / ALL /; SOLVE Calibrate USING LP MAXIMIZING obj; Display xA.l; Display xB.l; Marginal, Lagrange multiplier, shadow price, dual variable

  16. GAMS Output LOWER LEVEL UPPER MARGINAL ---- EQU objective . . . 1.000 ---- EQU xAup -INF 200.000 400.000 . ---- EQU xBup -INF 600.000 600.000 300.000 ---- EQU limit -INF 1800.000 1800.000 100.000 LOWER LEVEL UPPER MARGINAL ---- VAR xA . 200.000 +INF . ---- VAR xB . 600.000 +INF . ---- VAR obj -INF 3.6000E+5 +INF . Marginal

  17. Marginals • Marginal for a constraint = Change in the objective per unit increase in RHS of that constraint. • i.e., change xB • Objective = 360,000 • Marginal for constraint = 300 • Expect new objective value = 360,300

  18. New Solution LOWER LEVEL UPPER MARGINAL ---- EQU objective . . . 1.000 ---- EQU xAup -INF 199.333 400.000 . ---- EQU xBup -INF 601.000 601.000 300.000 ---- EQU limit -INF 1800.000 1800.000 100.000 LOWER LEVEL UPPER MARGINAL ---- VAR xA . 199.333 +INF . ---- VAR xB . 601.000 +INF . ---- VAR obj -INF 3.6030E+5 +INF . Note: Adding 1 unit to xB adds 300 to the objective, but constraint 3 says and this constraint is “tight” (no slack) so it holds as an equality, therefore xA must decrease by 1/3 unit for xB to increase by a unit.

  19. Unbounded Solution Take out constraints 3 and 4, objective can Increase without bound xA< 400 xA> 0 10 unbounded 8 6 xB (hundreds acres) 4 2 xB > 0 2 4 6 8 10 xA (hundreds acres)

  20. Infeasibility Change constraint 4 to >= 3000, then no intersection of constraints exists and no feasible solution can be found xA< 400 xA> 0 10 3xA +2 xB > 3000 8 xB< 600 6 xB (hundreds acres) 4 2 xB > 0 2 4 6 8 10 xA (hundreds acres)

  21. Multiple Optima xA< 400 xA> 0 10 Infinite solutions on this edge 8 Z=1800=300xA +200xB xB< 600 6 Change objective coefficient to 200, then objective has same slope as constraint and infinite solutions exist xB (hundreds acres) 4 3xA +2 xB < 1800 2 xB > 0 2 4 6 8 10 xA (hundreds acres)