1 / 6

GGUS @ OTAG 14/03/11

GGUS @ OTAG 14/03/11. Torsten Antoni, KIT. Middleware specific Workflows. Various different workflows DMSU workflow (prototype in January release ) DMSU 2nd level support Tech Provider 3rd level support Release announcement workflow (prototype in February release )

asher
Download Presentation

GGUS @ OTAG 14/03/11

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GGUS @ OTAG14/03/11 Torsten Antoni, KIT

  2. Middleware specific Workflows • Various different workflows • DMSU workflow(prototype in Januaryrelease) • DMSU 2nd levelsupport • Tech Provider 3rd levelsupport • Release announcementworkflow(prototype in Februaryrelease) • Tech Provider to SA2 and back • Bothworkflows in oneseperateinstance

  3. Technology Helpdesk TPM Technology Helpdesk DMSU EGI-SA2 GGUS RT accept/reject announce Technology release workflow Workflow for Bugs found in production Technology Provider (EMI / IGE)

  4. Report Generator • reportgeneratorremodeling(discussedtoday) New requirements • e.g. from Middleware groups • Focus on variabilityofthetool • Output only in furtherprocessableformats, e.g. xml (nographics)

  5. NGI Integration • Continuousintegrationof NGIs (ongoing) • Currently 28 NGIs in GGUS • 20 assupportunit (human interface) • 8 withautomaticinterface • 3 xGUSinstances (DE, CH, AEGIS) • 5 withlocal ticket system • Plan tohave all NGIs connectedbyTF’11 • Increasethe rate ofautomaticinterfaces • xGUSorlocalticket system • Maybedecdicatedmeetingforthisat TF?

  6. High Availabilityfor GGUS • Active – active high availablilityconcept • Data layerdone • Logicandpresentationlayerreadybythe end ofthefirst half of 2011

More Related