General Overview of the Romanian Nuclear Utility NUCLEARELECTRICA

General Overview of the Romanian Nuclear Utility NUCLEARELECTRICA. Dumitru Dina Head of Nuclear Safety Department. Content:. Introduction; Nuclearelectrica’s structure; Mission and strategic objectives; Units technical design characteristics; Nuclear spent Fuel storage;

asis
Download Presentation

General Overview of the Romanian Nuclear Utility NUCLEARELECTRICA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. General Overview of the Romanian Nuclear Utility NUCLEARELECTRICA Dumitru Dina Head of Nuclear Safety Department WASHINGTON DC, USTDA - 2010, September

  2. Content: • Introduction; • Nuclearelectrica’s structure; • Mission and strategic objectives; • Units technical design characteristics; • Nuclear spent Fuel storage; • Romania’s energy structure; • Cernavoda NPP performance; • Cernavoda Units 3&4 Project; WASHINGTON DC, USTDA - 2010, September

  3. 1. Introduction Romania chose to develop the nuclear program based on Canadian, American and Italian technology, recognized as Western safe design. The first Nuclear Power Plant in Romania was designed to operate with 5 units, CANDU-6 type, with a Generated Power of 706.5 MW(e) each. The site was chosen in SE of Romania, on Danube River, close to Cernavoda town, about 180 km far away east from Bucharest. WASHINGTON DC, USTDA - 2010, September

  4. 1. Introduction (cont’) WASHINGTON DC, USTDA - 2010, September

  5. SNN S.A. Cernavoda NPP – Units 1&2 Nuclear Fuel Plant Pitesti Safe & Efficient operation of Units 1&2 – CANDU-6: 700 MWe Nuclear fuel fabrication for two units 2. Nuclearelectrica’s Structure • Shareholders: • Romanian State – 90.28% • Property Fund – 9.72% • Main Activity: Electrical Power and Heat Production, NPP Construction and Commissioning and Nuclear Fuel Fabrication WASHINGTON DC, USTDA - 2010, September

  6. 3. Mission and Strategic Objectives Mission To produce electrical and thermal energy using nuclear fission, to develop the nuclear industry and fuel manufacturing, in full compliance with the highest nuclear safety standards, economic efficiency and protection of people and environment. 2009 – 2015 SNN Strategic Objectives General Objective: maintain it’s identity as a nuclear electricity producer, increase profitability and continuously improve the technical-economic indicators; Target-indicatorsassociated with the Strategic Objective Gross Capacity Factor: 93% for each unit; Personnel Indicator: 1man / installed MW for Units 1 and 2 Cernavoda NPP operation; Operation Cost: increase over 2009-2015 period - capped to 30%; Annual Profit Margin: 4-6% of the annual turnover; Installed capacity increase: by 50% through completing Units 3&4 (51% Romanian quota share) WASHINGTON DC, USTDA - 2010, September

  7. 4. Units technical design characteristics WASHINGTON DC, USTDA - 2010, September

  8. 5. Nuclear Spent Fuel Storage • Nuclear Spent Fuel Storage (AECL Canada) – first module 2003; the second 2006; the third 2007; fourth 2010 • Final profile: 4 small-sized modules (MACSTORE 200) and 34 large-sized modules (MACSTORE 400) – covering 40 years of operation for 4 Units ; WASHINGTON DC, USTDA - 2010, September

  9. 6. Romania’s Energy Structure (2008) WASHINGTON DC, USTDA - 2010, September

  10. 6. Romania’s Energy Structure (2009) – (cont’) WASHINGTON DC, USTDA - 2010, September

  11. 7. Cernavoda NPP’s Performance – (cont’) Gross Capacity Factor for Units 1&2 WASHINGTON DC, USTDA - 2010, September

  12. 7. Cernavoda NPP’s Performance – (cont’) CANDU reactors performance-Quarter 4 2009 WASHINGTON DC, USTDA - 2010, September

  13. 8. Cernavoda Units 3 & 4 Project INVESTORS NUCLEARELECTRICA EnergoNuclear PCO UNITS 3 & 4 Cernavoda NPP UNITS 1 & 2 WASHINGTON DC, USTDA - 2010, September

  14. 8. Cernavoda Units 3 & 4 Project (cont’) • MAIN CHARACTERISTICS: • Reactor Type: CANDU 6 • Installed Output: 2 x 720 Mwe • Delivered Power: 2 x 5,239 TWh/year • Completion Cost: aprox.4bl. Euro • (preliminary) • Schedule: 77 months per unit • (preliminary) • Unit Life: 30 years, possible 50 WASHINGTON DC, USTDA - 2010, September

  15. 8. Cernavoda Units 3 & 4 Project (cont’) 15 Sep 10 15 Mar 09 Milestones (preliminary) Approvals 1 Month FIDD Joint Written Declaration by the Shareholders Confirming Agreement Registration EnergoNuclear Development 18 Months Construction 77 Months 15 Oct 10 15 Dec 08 Confirmation of Final Binding Approvals to Execute Contracts Investor Agreement in Force WASHINGTON DC, USTDA - 2010, September

  16. 8. Cernavoda Units 3 & 4 Project (cont’) Why CANDU? Existing Cernavoda site –licensed by Romanian Regulatory Body •Take advantage of the advanced status of site civil works:52% Unit 3 and 30% Unit 4 started on CANDU 6 technology •Excellent operating records at Cernavoda Units 1&2 •Proven technology: CANDU Units in operation are among top ranked plants worldwide •Existing local qualified expertise for CANDU plants in: design and R&D manufacturing fuel and heavy water construction, commissioning, operation & maintenance •Licensing process initiated: Licensing Basis Document : approved Environmental Permit: in final stage Other main licenses activities: in progress WASHINGTON DC, USTDA - 2010, September

  17. 8. Cernavoda Units 3 & 4 Project (cont’) Notification to EURATOM on the basis of art. 41 • Art. 41 of the EURATOM Treaty “The individuals and industrial sectors described in Appendix II (nuclear power reactors of all types and for all usage purposes) have the obligation to notify the Commission the investment projects regarding new installations, as well as replacements and transformations in conformity to the criteria regarding the nature and the importance defined by the Council and established at the proposal of the Commission” • EnergoNuclear has notified the European Commission in accordance with art.41 of EURATOM treaty in June 2009 • Currently, the European Commission is analyzing the project from the point of view of compliance with the provisions of the EURATOM Treaty and will send the Romanian authorities the official opinion. The favorable opinion of the European Commission represents a condition to start construction works on the two nuclear units and also for a possible EURATOM credit request by the Romanian Government. WASHINGTON DC, USTDA - 2010, September

  18. 8. Cernavoda Units 3 & 4 Project (cont’) • EnergoNuclear develops the Project, according to the Investor Agreement endorsed by GD 1565/2008, in two phases: • Phase 1: The Pre-Project Phase • 1. To arrive at final Project definition and cost and to perform the work required to achieve FID (Final Investment Decision) • Inspection and evaluation of the existing assets • Selection of main contractor • Review of the feasibility study • Negotiation and conclusion of main contracts and agreements (O&M, electricity off-take, decommissioning and waste disposal, etc.) • Obtaining necessary approvals and licenses • Financial agreement WASHINGTON DC, USTDA - 2010, September

  19. 8. Cernavoda Units 3 & 4 Project (cont’) • 2. To perform technical/commercial work required to meet the project schedule post-FID • Tech Specs for long term delivery equipment • Initial plan for recruiting key operational staff • 3. The Pre-Project Phase shall have as a result the Final Investors Decision by FIDD (September 30th 2010) • Remarks • Only activities necessary to obtain the construction license and to meet project schedule requirements will be undertaken • No construction work will take place during Pre-Project phase WASHINGTON DC, USTDA - 2010, September

  20. 8. Cernavoda Units 3 & 4 Project (cont’) • Phase 2: The Project Phase • Implementation of the Project by the Main Contractor. • Main activities to be delivered: • detail design and licensing • equipment procurement • construction and installation • commissioning and testing • starting commercial operation WASHINGTON DC, USTDA - 2010, September

  21. THANK YOU! WASHINGTON DC, USTDA - 2010, September