Final Report Terminal X McCarran International Airport

Final Report Terminal X McCarran International Airport. Team Introduction. John Condon – Project Manager Nate Linden – Project Engineer Jason Lindsey – Project Engineer Natalie Whiteman – Project Engineer Eric Wojak – Project Engineer/Client Liaison. Las Vegas, Nevada.

Download Presentation

Final Report Terminal X McCarran International Airport

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Final ReportTerminal XMcCarran International Airport

  2. Team Introduction • John Condon – Project Manager • Nate Linden – Project Engineer • Jason Lindsey – Project Engineer • Natalie Whiteman – Project Engineer • Eric Wojak – Project Engineer/Client Liaison Las Vegas, Nevada

  3. Presentation Overview • Review Previous Presentation • Project Results Kuala Lumpur International Airport

  4. Review of Previous Presentation • Codes and Regulations • Design Criteria • Geotechnical Report • Expansion Joint Spacing • Concrete and Steel Gravity Systems • Design Option Assessment Fresno International Airport

  5. Codes and Regulations • Clark County Building Code • IBC 2003, With Amendments • ASCE 7-02 • ACI 318 • AISC LRFD

  6. Geotechnical Report • Kleinfelder, Inc. Summary • Soil Analysis • Seismic Design Category • Recommended Foundations

  7. Proposed Terminal

  8. Terminal Section Gridlines Typical Bay

  9. Gravity System Design • Steel Gravity System • Designed Typical Floor System • Structure Designed using RAM • Verified with Hand Calculations • Concrete Gravity System • Designed Typical T-Beams • Designed Typical Bays by Hand

  10. Decision Matrix Constructability Rating Performance Rating Initial Cost Rating Construction Schedule Rating

  11. Decision Matrix

  12. Project Completion • Conceptual Roof Options • Lateral System • Connection Design • Foundation Design • LEED Assessment • Construction Cost Estimate Las Vegas, Nevada

  13. Conceptual Roof Options • Steel Space Frame • Steel Joist/Joist Girder • Structural Fabric Three Dimensional Rendering of Steel Space Frame Option

  14. Lateral System • Wind and Seismic Loads • Layout of Frames • Moment Frames • Braced Frames • Diaphragms Level 1 Lateral Force Resisting System Layout Computer Model of Moment Frame

  15. Connection Design • Gravity System Connections • Lateral System Connections Typical Connection Detail

  16. Column No. 11 Bar 3’-0” 3” cover 14’-9” Shallow Foundation Design • Three Typical Footing Sizes • Material Quantities • Concrete = 8720 yd3 • Steel = 49.7 tons

  17. Construction Cost Estimate