1 / 36

Project Title

Project Title. (See Notes Page View for tips on how to make this an effective Final Presentation). Define Phase. Define Phase Introduction. Project Description (Put Title Here). Reduce/optimize/increase ___________________________ (project y)

Download Presentation

Project Title

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Title (See Notes Page View for tips on how to make this an effective Final Presentation)

  2. Define Phase

  3. Define Phase Introduction

  4. Project Description (Put Title Here) Reduce/optimize/increase ___________________________ (project y) from ________________________________________(current level) to ___________________________________________ (good level) for ________________________________________ (specific area) while reducing/increasing/holding constant _________________________________________( constraining Y’s) Objective: Include $ benefits Benefits: Project Team: Belt: Team members: Sponsor: Controller: MBB: Schedule: Measure: ___________________ Improve: __________________ Analyze: ___________________ Control: __________________ Closeout: ___________________

  5. Project Tracker Update your project trackers (Automated project tracker – Rev5.xls) with your project Dates and progress to date, then paste into PowerPoint (Edit>Paste special >picture)

  6. 30+ Inputs All X’s • Process Maps MEASURE 10 - 15 1st “Hit List” • C&E Matrix • Failure Modes and Effects Analysis • Multi-Vari Studies 8 - 10 ANALYZE Screened List IMPROVE • Design of Experiments (DOE) 4 - 8 Found Critical X’s CONTROL 3 - 6 • Control Plans Controlling Critical X’s Critical Input Variables The Funneling Effect

  7. Define Phase Summary

  8. Measure Phase

  9. Measure Phase Introduction

  10. Process Map

  11. C&E Matrix

  12. FTA

  13. FMEA

  14. MSA Study

  15. Measure Phase Summary

  16. Analysis Phase

  17. Analysis Phase Introduction

  18. Capability/Baseline Study

  19. Multi-Vari Study

  20. Analysis Phase Summary

  21. Improve Phase

  22. Improvement Phase Introduction

  23. Designed Experiment Study

  24. Improvement Phase Summary

  25. Control Phase

  26. Control Phase Introduction

  27. Final FMEA

  28. Improved MSA Study

  29. Final Capability / Improvement Chart

  30. Procedures

  31. Failsafing

  32. Control Plan

  33. Financial Summary

  34. Other Projects Identified

  35. Lessons Learned

  36. Control Phase & Project Summary

More Related