130 likes | 506 Views
Grounding Practices. Dead? or A live?. APPLYING GROUNDS. Test for Zero Energy Use Proper Style of Clamp Proper PPE Apply Ground Lead First, Remove Last Apply to each Phase with Care “Never Tease the Bus”. Proper Grounding ?. Zero Potential Zone. Grounding Platforms Switch Operators
E N D
Grounding Practices • Dead? or • A live?
APPLYING GROUNDS • Test for Zero Energy • Use Proper Style of Clamp • Proper PPE • Apply Ground Lead First, Remove Last • Apply to each Phase with Care “Never Tease the Bus”
Zero Potential Zone • Grounding Platforms • Switch Operators • Bonding Straps • Hardware
Ground Grid Systems • Structure Grounds • Fence Grounds • Switch Grounds • Equipment Grounds • Personnel Platforms
Step and Touch Potentials Fence/Gate Structure Equipment
Proper Safety Equipment is Mandatory • Hot Line Tools • Grounding Discharge Sticks • Grounding Cables • Protective Hoods • Rubber Mating