1 / 4

Min. Values [ eVs ] Abucket / Abucket /4 h=1 …3.0 / 0.75 h=2 …1.1 / 0.27 h=3 …0.57 / 0.145

Bucket Area for h = 1,2,3 Vrf = 60kV, Frep =10Hz, Sinusoidal Ramp, 75 % Rise time ( Complement to my presentation of 30/03/2011). Abucket eVs. Vrf (kV). Min. Values [ eVs ] Abucket / Abucket /4 h=1 …3.0 / 0.75 h=2 …1.1 / 0.27 h=3 …0.57 / 0.145.

atara
Download Presentation

Min. Values [ eVs ] Abucket / Abucket /4 h=1 …3.0 / 0.75 h=2 …1.1 / 0.27 h=3 …0.57 / 0.145

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bucket Area for h = 1,2,3Vrf = 60kV, Frep=10Hz, Sinusoidal Ramp, 75% Rise time( Complement to my presentation of 30/03/2011) Abucket eVs Vrf (kV) Min. Values [eVs] Abucket / Abucket/4 h=1 …3.0 / 0.75 h=2 …1.1 / 0.27 h=3 …0.57 / 0.145 PSB Energy Upgrade Working Group 14/04/2011

  2. Steve Hancock’s LHC Beam Parameter List PSB Energy Upgrade Working Group 14/04/2011

  3. Proposed RCS Parameters • Circumference C = 4/21 CPS • h = 1 + 2 -> hPS= 7 (implies bunch splitting to h = 21 in the PS) • Alternatively (If RF system allows): h = 4 16 bunches into hPS= 21 buckets; • fast bunch blow-up at the end of the RCS cycle PSB Energy Upgrade Working Group 14/04/2011

  4. Example Lattice (18 Cell Racetrack)(M. Fitterer) C=119.68 m, Q1 = 5.14286, Q2 = 5.14286, gammat=4.92 PSB Energy Upgrade Working Group 14/04/2011

More Related