130 likes | 334 Views
Rivalta , La città della logistica. LOCA TION. The Rivalta perspective rail connections. RIVALTA SCRIVIA (HEADQUARTER). MISSION. The new “DRY PORT” of Genoa. FIGURES. Total area 1.200.000 sm. Terminal Container – 1° lot 250.000 sm.
E N D
Rivalta, La città della logistica
LOCATION The Rivalta perspective rail connections • RIVALTA SCRIVIA (HEADQUARTER)
MISSION The new “DRY PORT” of Genoa
FIGURES • Total area 1.200.000 sm. • Terminal Container – 1° lot 250.000 sm. • Entry and Inspection area/Offices 10.000 sm. • Container maintenance and repair 6.000 sm. • Green area 284.000 sm. • Development area 650.000 sm.
FACILITIES 9 Employees 15 Lift truck operators 4 Reach stackers 1 Forklift 30 tons 4 Frontlift for empty container 2 Diesel Locomotive 4 Sets of wagons composed each by 12 s26 1 Transtainer 4/5/4 Reggiane
VOLUMES R.T.E.SHUTTLE TRAINS In 2012 Rivalta Terminal Europe moved 11 couples of train per week. For 2013 we forecast to increase up to 13.
SERVICES Intermodal logistic chain: flow chart Container freight station (CFS) I.R.S. R.T.E. Container yard (CY) Shuttle
SERVICES Clearing at Rivalta VTE SHIPPING COMPANY CARGO MANIFEST RAIL TRANSPORT ORGANIZATION RAIL COMPANY SHUTTLE RTE DELIVERING BY TRAIN DELIVERING BY TRUCK CONSOLIDATION JOINT AND SEVERAL BOND BUYER CUSTOM
SERVICES • Daily rail service (Shuttle) from/to sea terminals • Internal Genoa customs office • Internal Usmaf office • Import / Export customs operations • No need of any transit document (T1, CIM) • Customs inspections inside the terminal Import Shuttle Terminal (CY) Export Inland terminal (CY)
NEW PROJECTS The new Projects PROJECT TIGER INLOG / TIANJIN
TIGER Tiger Project • TIGER PROJECT is the model for the new working of the trains beetwen corridor Genoa – Rotterdam and it is co-financied by UE • TIGER PROJECT forecasts the integration of the most modern IT and rail signs tecnologies • The terminals involved into the project (San Giorgio, Vte, Rte, etc) will be connected with all modalities with rail networks and equipped with the most innovative systems for logistic operations. (computerized customs, automatic recognition of containers and goods, etc)
TIANJIN • Tianjin Project: • Creation of a logistic platform, starting with 100.000 sq. of warehouses and squares, in order to help the commercial interexchange between China and Italy through the ports of Tianjin and the portual and retroportual system of Genoa (Rivalta Terminal Europa) • Chartered custom agreements in order to advantage the exchange of the goods beetwen the two countries • Coordination inside the platform of the activities of freight forwardes, logistic operators, financial and insurance operators, commercial brokers and suppliers of physical services to the goods • Other services for the companies, like legal and fiscal assistance, market information, availability of a show room
UIRNET • UIRNET Project: • Uirnet first goal is improving the logistic system of the country, developing: • - Support services to the intermodality; • - Services for truck companies and drivers; • - Support services to the companies. • Uirnet platform will provide services for the market of logistics, particulary dedicated to freight forwarders (matching demand and offer, supporting basic and advanced services, managing transport flows, etc) and truckers (traceabilities of the shippings, prevention and communication of critical events, support into information exchanges between logistic operators,etc)