Obligatory Products: Consultation Closures. Anthony Sheppard Portfolio Strategy. Status of Products in Issue 2 of List. Out of the 62 Products detailed :- Products for which “consultation not required” – 8 Products for which “consultation completed” – 27 

Download Presentation

Obligatory Products: Consultation Closures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Obligatory Products: Consultation Closures Anthony SheppardPortfolio Strategy

  2. Status of Products in Issue 2 of List • Out of the 62 Products detailed :- • Products for which “consultation not required” – 8 • Products for which “consultation completed” – 27  • Products for which “Migration Status” amended – 27 • generally from “Migrate with Changes” to “Migrate Unchanged”  • Products whose Consultation End dates have been extended – 12 • e.g. LLU, DataStream and IPStream in light of TSR implications • Products impacted by TSR • e.g. LLU (MPF, SMPF), WLR, DataStream, IPStream, AISBO (WES, BES)

  3. BT believes Consultation not required • Dialled Data 28.8 kbit/s • BT confirmed no 21CN impact • ISDN2 (Pre-ETSI) • being dealt with bilaterally • BT Pay and Call • No external customers • TISBO 2 – 8 Mbit/s • No 21CN impact • Payphone Access Charge • No 21CN impact • Numbering Plan • Ofcom scheduled to consult • KiloStream (2.4 – 960 kbit/s) • Remains on legacy platform • MegaStream • Remains on legacy platform (MX 8 closed to new supply)

  4. WG Colour Coding

  5. BT believes Consultation Completed (1)

  6. BT believes Consultation Completed (2)

  7. BT believes Consultation Completed (3)