An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nonpoint Source (NPS) Program PENNVEST Funding For: Non-Point Source Pollution Projects Brion Johnson, Deputy Executive Director

  2. Categories of NPS pollution projects • Agriculture • Urban Runoff • Abandoned Mine Drainage • Brownfields

  3. Green InfrastructureProjects Examples of eligible green infrastructure • Installation of porous pavement, green roofs and other approaches to managing wet weather run-off • Street tree and urban forestry programs • Installation of riparian buffers and wetlands • Downspout disconnection programs to eliminate storm water from combined sewer systems • Installation of water meters • Purchase of leak detection equipment • Energy efficiency – retrofits and upgrades to pumps and treatment processes • Installation of water efficient fixtures, fittings, equipment and appliances

  4. Types of Specific Practices • Agricultural BMPs: BMPs in NRCS Technical Manual • Urban Runoff: BMPs in DEP Stormwater Best Practice Manual (Limited to “Developed” areas identified in County Comprehensive Plan) • AMD & Brownfields: Specific lists of BMPs in the Preliminary Program Design manual

  5. Non-Point Source in Parks • Low Impact Storm Water Strategies • Best Management Practices • Pervious Asphalt • Bio retention/Rain Gardens • Emergent Plantings • Tree Plantings • Erosion and Sedimentation Control

  6. Towamencin Township – Fischer’s Park • Treat Stormwater Run-off for: • 85% Suspended Solids • 85% Phosphorus • 30% nitrates

  7. Towamencin Township – Fischer’s Park • $281,964 • 35,910 square feet of pervious paving • Infiltration Bed • Store 9,170 cubic feet of storm water

  8. OhioPyle – Green Infrastructure Project • Reduce Inflow and infiltration • Eliminate Hydraulic Overloads at WW Plant • Remove storm water during peak flows

  9. OhioPyleGreen Infrastructure Project • $1,312,718 • 22,000 square feet of pervious paving • Rain Barrels • 2 cisterns • curbing

  10. Lewisburg / East Buffalo Township / Kelly Township – Multi-Generation Park

  11. Nutrient Trading • Nitrogen and Phosphorus Credits • Chesapeake Bay Only • Determined by DEP based upon water quality impacts • Auctions Conducted by PENNVEST • Value determined by auction process • PENNVEST Provides security to both buyer and seller

  12. Eligible Applicants • Municipalities • Municipal Authorities • County Conservation Districts • Watershed Organizations • Nonprofit Organizations • Other Private Entities

  13. Partnering with state agencies PENNVEST has a history of working with other state and local entities to maximize resources and improve water quality. DCNR, DEP, and DCED are a strong partner in the development of traditional and alternative solutions to water quality issues impacting local communities.

  14. Technical requirements • Design completion • Identified problem with alternatives that have been analyzed – so that it is clear that the proposed project is the best use of funds and will work! • Site specific plans – consult with PENNVEST and PADEP for what is appropriate for various types of projects • Plan and profile drawings • Clear description of WHAT is being done and HOW. • Implementation plan • Clear construction schedule • Permits in hand before application • Plans for inspections during and after construction • Operation and maintenance provisions • Environmental review • Requirements vary – consult with PADEP

  15. PADEP carries out project analysis • Water Quality 40% • Compliance 10% • Planning 25% • Benefit-to-cost 20% • Safety 5%

  16. Funding Summary • Projects Approved: • 3,159 • 976 Drinking Water • 1,480 Waste Water • 15 Brownfield • 3 Acid Mine Drainage • 115 Storm Water • 468 On-Lot • 102 Non Point Source • Total Funding approved to Date: • $7.1 Billion

  17. Projected Fiscal Year 2013-2014 Funding Budget(and beyond?) • Total: $335 million • Loans: $300 million • Grants: $35.4 million • Growing Greener • Federal SRF’s • Marcellus impact fee (Act 13) • Minerals extraction royalties (Act 147)

  18. https://www.act13-reporting.puc.pa.gov/Modules/PublicReporting/Overview.aspxhttps://www.act13-reporting.puc.pa.gov/Modules/PublicReporting/Overview.aspx

  19. NPS – Financial Capability Criteria Based upon the land owner / benefactor capacity Factors considered: Private For Profit – Revenues, available funds and the impact of debt service Governmental and Not For Profit – Unrestricted cash and investments, operating expenses and cash flow as related to debt service.

  20. How to apply • Contact the PENNVEST Project Specialist for your area of the state • Participate in a planning consultation meeting with PENNVEST and DEP • Submit application through PENNVEST website: www.pennvest.state.pa.us

  21. PENNVEST CONTACTS • PV Region 1 – Dave Henning 717-783- 4490; dahenning@pa.gov Northwest and North Central Pennsylvania • PV Region 2 – Larry Gasparato 717-783-6673; lgasparato@pa.gov Southwest Pennsylvania • PV Region 3 – Tess Schlupp 717-783-8618; tschlupp@pa.gov South Central and Southeastern Pennsylvania • PV Region 4 – Rebecca Kennedy 717-783-4493; rebkennedy@pa.gov Northeastern Pennsylvania

  22. PENNVEST Website http://www.pennvest.state.pa.us

  23. Questions or Follow-up? Brion Johnson: 717-783-6798 bjohnson@pa.gov PENNVEST in general: www.pennvest.state.pa.us To find a Project Specialist by county, go to the homepage of our website and click on the “Regional Assistance” link under the map on the left-hand side.