1 / 16

US Army Information Systems Engineering Command

Page 2 of

august
Download Presentation

US Army Information Systems Engineering Command

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Page 1 of # US Army Information Systems Engineering Command LWN I3MP Conference 20 August 2008

    2. Page 2 of # Agenda Purpose Current BRAC Projects Current MCA Projects OPA IT Tail Funding Implementation Strategies PM NSC Involvement Site Information IT BRAC Office Contact Information MILCON Group Contact Information

    3. Page 3 of # Current BRAC Projects FY # of Projects 06 11 07 60 08 85 09 93 10 80 Total 329

    4. Page 4 of # Current MCA Projects FY 08 Program # of Projects Billions $ MCA 144 $3.820 GWOT 67 1.440 USAR 12 .133 ARNG 57 .464 Total 217 $5.857 FY 09 Program $6.500* FY 10 Program $5.500* *Subject to Congressional Approval

    5. Page 5 of # Per AR 420-1, Chapter 4 Telephone Instruments NIPR and SIPR Data Switches Common User Telephone Switches/ New Installs/Upgrades Telephone Switch Expansions/Line Cards SIPR Encryption Devices Digital Range Connectivity

    6. Page 6 of # IT Implementation Strategies DOIM Contracts PM, NSC Contracts ISEC TEIS II Corps of Engineers – Construction Contracts PM, DCATS Contracts

    7. Page 7 of # PM, NSC Involvement (Potential) Telephone Switches/RSUs Data Switches/ADNs Extensive OSP for Infrastructure projects Other IT Purchases (phone instruments, data switches, etc.)

    8. Page 8 of # FY08 I3MP Engineering Ft Benning Pull fiber (Approx 3-5 miles) into new COE MH/Duct in support of Infrastructure Project 4 New ADN/RSUs Harmony Church 3 (in COE hut) Harmony Church 4 (in COE hut) Maneuverability Center of Excellence (in COE hut) New Hospital Facility (in MEDCOM hospital main TR or Hut) Expand Existing Voice Switch Footprints/Capacity at DCO, Sand Hill, HC1, HC2, MACH, Kelley Hill, 8854, 8855, 8856 Range connectivity to all digital ranges

    9. Page 9 of # FY08 I3MP Engineering (Cont’d) Ft Bragg Survey and Provide Alternatives for the Interoperability between Main Post and Pope AAF HQDA CIO/G-6 Will Determine Feasibility of Alternative Execution Connectivity to GOQ CORE Infrastructure to Mackall ADN/RSUs at Mackall/FORSCOM USARC HQ Redundant fiber connectivity to FORSCOM USARC HQ

    10. Page 10 of # FY08 I3MP Engineering (Cont’d) Ft Leonard Wood MCN/ADN Node 1 Supporting New BCT and Prime Power School RSU to Support Hospital Addition Ft Knox RSU for HRC/Accessions Command Range Connectivity to all Digital Ranges Ft Sam Houston Install Voice Switch and OSP to Support METC

    11. Page 11 of # FY08 I3MP On-Going Ft Bliss ADNs for BCT 1 and BCT 2 ADN for CAB Cabling for BCT 1 Infrastructure Cabling for BCT 2 and CAB Cabling for BCT 3/Fires Brigade Infrastructure (Future) ADN for BCT 3 and Fires Brigade (Future) Potential Cabling/ADNs/etc. for BCT 4, IBCT 1, IBCT 2, AETF, and Towne Center Areas Range Connectivity to all Digital Ranges and Integration with WSMR Ranges

    12. Page 12 of # FY08 I3MP On-Going (Cont’d) Aberdeen PG (C4ISR Campus) SONET Ring Cabling of CORE Infrastructure ADN/MCN Digital Voice Gateway Ft Carson RSU at Spector & Titus Potential New BCT Requirements Ft Leavenworth Fiber connectivity to DCO ADN/RSU in Hut to support Regional Correctional Facility (RCF) Upgrade DCO to Accommodate Remote Connectivity

    13. Page 13 of # FY08 I3MP On-Going (Cont’d) Ft Lee ADN/RSU at SCOE HQ Hot Swap - Mifflin Hall to SCOE HQ Bldg Log U – Voice Switch and Site Prep Ordnance Complex (TA-5) – Voice Switch, ADN, OSP to MH Outside Hut Voice Mail System Ft Meade CORE Infrastructure and Cabling DISA Media Adjudication

    14. Page 14 of # FY09 I3MP Engineering Ft Eustis Voice Switch Upgrade in DCO to Support HQ TRADOC ADN in HQ TRADOC Bldg Voice Mail Switch Upgrade Redstone Arsenal ADN/RSU (VoIP Capable) – HQ AMC and USASAC Campus Area RSU in an Existing Hut – Rotary Wing Center of Excellence

    15. Page 15 of # FY09 I3MP Engineering (Cont.) Ft Lewis Range Connectivity to all Digital Ranges Potential New Voice Switches or Expansions Other Potential MCA Support at Forts Huachuca; Jackson; Hood; Dix; and White Sands Missile Range

    16. Current IT BRAC Office contact information. The Site Project Leads are the main point of contact between ISEC and the tenants, DOIMs, RCIOs, CIO/G-6, and ACSIM representatives. They are supported by engineers from within the ISEC directorates, depending on the specific functional requirement (i.e. C2, outside plant, inside plant, data network, voice, SIPRNET, LMR, satellite, microwave, information assurance, etc). We have aligned ourselves in the same regions as the RCIOs, so as to try and keep as many of the same folks working together.Current IT BRAC Office contact information. The Site Project Leads are the main point of contact between ISEC and the tenants, DOIMs, RCIOs, CIO/G-6, and ACSIM representatives. They are supported by engineers from within the ISEC directorates, depending on the specific functional requirement (i.e. C2, outside plant, inside plant, data network, voice, SIPRNET, LMR, satellite, microwave, information assurance, etc). We have aligned ourselves in the same regions as the RCIOs, so as to try and keep as many of the same folks working together.

More Related