150 likes | 324 Views
GPETE Standardization. Greg Hogan NSWC Corona Det Seal Beach. Overview. Standardization Method. Assess SCAT/ Model Allowance/Inventory Footprint and Prime System(s) Application AIF Assess Current Prime System Category I & II Measurement Requirements PSR
E N D
GPETE Standardization Greg Hogan NSWC Corona Det Seal Beach
Overview Standardization Method • Assess SCAT/Model Allowance/Inventory Footprint and Prime System(s) ApplicationAIF • Assess Current Prime System Category I & II Measurement RequirementsPSR • Develop/Update Consolidated Multiple Prime System SCAT Measurement Footprint Minimize/Optimize GPETE Inventory around Reliable Maintainable SCAT Measurement Technology • Develop/Update NAVSEASCAT Performance & Lifecycle Support Requirements Specification • Develop budget and forward Requirement Specification to NAVICP contracts for implementation Next
Allowance & Inventory Footprint Organized by Class Prime Systems Navigation ECM Communication RADAR CGN Prime System Ship Ship 1 Ship 2 Ship 3 Ship n System 1 System 2 System n CG/DDG CV/CVN/LHD/LHA Back
Prime System Requirements Prime System 1 Prime System 2 Prime System n ISEA Responses Prime System Measurement Parameter Meas 1 (Volts) Meas 2 (Acc) Meas 3 (Res) Meas n System 1 850 Vdc 4 % < 3.4 V System 2 795 Vdc 5 % < 4 V System n 815 Vdc 10 % < 8.2 V Back
Composite Prime Systems A, B, & C Measurement Requirements NAVSEA Measurement Requirements SCAT Measurement Foot Print & Required Model Performance Prime System A Prime System C Prime System B Back
Coordination and Application Fleet Input Input Support Contractors Evaluation PS Acquisition Programs Categorize Measurement Requirements Individual Systems Group Multiple Systems TYCOMS & FLEET REPS Develop Measurement Disciplines RMC Subject Matter Experts RMC Calibration Centers PS ISEAs
Teaming with Industry • Sharing technical requirements with Industry promotes competition • Ensure same requirements are provided to all interested vendors • “Industry Days” • Ethical, fair and in best interest of the Navy • Coordinate with NAVICP to ensure industry equipment candidates are compliant with NAVSEA requirement
NAVSEA Measurement Requirements • Identifies necessary Prime System Measurements needed for SCAT Definition • Identifies necessary Life Cycle Logistics Elements needed for SCAT Life of Type Support • Reflects military standards (MIL-PRF-28800) • Establishes a baseline reference for next generation instrumentation
Functional Groups • Ph • Phase Sequence • Audio Analyzer • Sound Level • Termination • Data Acquisition • Modulator • Adapter • Coupler • Detector • Divider • Filter • Conductivity • Earth Ground • Echo Box • Isolator • Battery Analyzer • PCB Test • Impedance • Signal Generator • Digital Multimeters • Baseband Generator • Synchro Resolver • Spectrum Analyzer • Calibrator • Logic Analyzer • Oscilloscope • Voltmeter • Frequency • LAN/WAN • Telcomm Analyzer • Power Supply • Bit Error Rate Tester • Comm Analyzer • Recorder • Insulation Breakdown • Power Analyzer • Component Test • Impedance Matcher • Field Strength • Noise • Radar Test Set • Modulation Analyzer • Probe • Power Meter • Attenuator • Fiber Optics • Distortion • Data Analyzer • Electrical Safety • Network Analyzer • Resistor • Scalar Analyzer • Photo Tachometer • Resistance • Capacitor • Amplifier • Humidity • Dummy Load • Temperature • Transformer • Time/Freq-Domain • Reflectometry • Vibration • Oxygen • Switch • Potentiometer • Mixer • Power Limiter • Antenna • Inductor • Torque • Earth Ground • Signature Analyzer • Teletype • Monitor
Work Effort/Work Initiatives • Process • Past 5 years • Reduced SCATs & Models • Next 5 years • Target Functional Groups for SCAT/Model reduction
Analysis Process • Decision considerations • Review Obsolescence SCAT codes • Review of failure data • Review of calibration periodicity • Consolidation of SCAT requirements • Functional Group Analysis
Next 5 Year Candidates • Target candidates: • Power Meters • Meggers • Time Domain Reflectometer • Spectrum Analyzers • Data System Analyzers
Candidate Information • Requesting Fleet Input at this time for other prospective candidates
Questions Greg Hogan Gregory.hogan@navy.mil Phone: 562-626-7192 DSN: 873