Chapter 7 Preliminary Construction The broad scope of implementation

Chapter 7 Preliminary Construction The broad scope of implementation Preliminary construction in the SDLC Preliminary construction activities Preliminary construction management. The Broad Scope of Implementation Multi-phased Structure Fig 7.1: A Structure of Implementation.

Download Presentation

Chapter 7 Preliminary Construction The broad scope of implementation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 7 • Preliminary Construction • The broad scope of implementation • Preliminary construction in the SDLC • Preliminary construction activities • Preliminary construction management

  2. The Broad Scope of Implementation Multi-phased Structure Fig 7.1: A Structure of Implementation

  3. The Broad Scope of Implementation Checklist Fig 7.4: Checklist of Implementation Activities

  4. Preliminary Construction in the SDLC Fig 7.2: Preliminary Construction Phase Overview

  5. Preliminary Construction in the SDLC • Steps • Construct new system software modules and test data • Demonstrate the modules to users and project sponsors • Activities • Prepare physical facilities • Install hardware • Install/code software • Build test files • Prepare training materials

  6. Preliminary Construction in the SDLC The activities span multiple project phases Fig 7.5: Preliminary Construction Activities Span Multiple Phases

  7. Preliminary Construction Activities • Prepare physical facilities • Minimal for PCs, a full-scale construction project for larger systems • Install hardware • RFPs, vendor proposals, vendor selection

  8. Preliminary Construction Activities • Install/code software • Development environments Fig 7.6: Coding and Unit Testing Occur in the First of Four Software Staging Environment

  9. Preliminary Construction Activities • Install/code software • The iterative process of testing • Fig 7.7: Software Integration Process: Testing and Revising

  10. Preliminary Construction Activities • Install/code software • The development sandbox environment should include • Short data files • Copies of the latest software • Copies of JCL language • Systems documentation • Change log

  11. Preliminary Construction Activities • Install/code software • Advantages of a development sandbox environment • Reduce the chance of introducing errors into the production environment • Reduce the risk of not finishing all functions • Save time and money • Eliminate production environment interference

  12. Preliminary Construction Activities • Install/code software • Selecting and installing purchased software Table 7.1: Evaluation of Development Languages: JAVA AND C++

  13. Preliminary Construction Activities • Install/code software • Responsibility for custom coding depends on • Availability of development tools • Hardware complexity • The functionality versus efficiency issue • Expected frequency of change and volume of exception reports

  14. Preliminary Construction Activities • Install/code software • Programming standard guidelines for spreadsheet development • Know your problem • Design modules top down • Keep modules small • Document your work • Organize your spreadsheet

  15. Preliminary Construction Activities • Build test files • Testing all transaction combinations using decision logic tables (DLTs) • Fig 7.8: The Format of a Decision Logic Table

  16. Preliminary Construction Activities • Build test files • A “high-level” application example Fig 7.9: A Decision Logic Table of Key Custom Software Decisions

  17. Preliminary Construction Activities • Build test files • An example of program logic • Fig 7.10: A Decision Logic Table of Credit Approval

  18. Preliminary Construction Activities • Prepare training materials • Advantages of a separate training environment • Reduce the chance of introducing errors into the production environment • Reduce the risk of not training all functions • Save time and money • Eliminate interference with production

  19. Preliminary Construction Activities • Prepare training materials • The training environment should include • Short data files that match training instructions • Training instructions • Feedback of the results of training actions

  20. Preliminary Construction Management Managing project direction Fig 7.11: JAD Review and Confirmation Workshop

  21. Preliminary Construction Management Managing scope, schedule, and resources Fig 7.12: Balancing Scope, Schedule, and Resources